Similar Projects
Y1da--Add AHU Metering Louis Stokes VAMC
Design
$1,000,000 to $5,000,000 est. value
Cleveland, OH 44106

Boiler Replacement
Alteration
Bidding
$70,000 est. value
New Washington, OH 44854

Mechanical Contractors and Electrical Contractors - Upgrades to Mechanical Systems
Alteration
Bidding
Warren, OH 44483

Central Safety Building HVAC System Reno
Post-Bid
Columbus, OH

HVAC Services for Campus
Post-Bid
Cincinnati, OH

Bldg Exhaust System
Results
Catawba Island, OH 43452

SWWTP Sludge Dewatering Building HVAC Replacement
Results
Columbus, OH

West Elementary AHU-1 Heating Replacement
Post-Bid
Less than $180,000 est. value
Newcomerstown, OH

HVAC Replacements FY 2019 - Phase 2 - Bid Package 1
Results
Less than $1,960,000 est. value
Columbus, OH 43210

Piping Replacement
Post-Bid
Dayton, OH 45390

SWWTP East Aeration Control HVAC
Results
Columbus, OH

MERV Filters for CML HVAC Equipment
Post-Bid
Columbus, OH 43215

HVAC RTU Replacement A-B-D Franklin
Results
Less than $1,067,150 est. value
Columbus, OH

Supply and Install Air Conditioning Units at Alliance Towers
Post-Bid
$110,000 to $130,000 est. value
Alliance, OH 44601

Solon Parkside Elementary and Middle School HVAC Improvements Phase IV
Results
$90,000 est. value
Solon, OH 44139

Last Updated 06/25/2021 02:57 PM
Project Title

Replacement of Hot Temperature Hot Water (HTHW) Line D at WPAFB

Physical Address View project details and contacts
City, State (County) OH   (Greene County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Design / Bid / Build includes all labor, equipment, and material to replace the existing Steam/High Temperature Hot Water (HTHW) heating distribution system with a natural gas fired heating system. Project provides new building/mechanical space and all utilities and controls required to support natural gas boilers. Provide new natural gas fired boilers and all associated piping, valves, DDC controls, and equipment including connections to existing facility heating distribution systems. Work includes tie-ins, demolition, and capping/sealing of existing steam and HTHW piping, hot water heat exchangers, and low-pressure steam reducing stations. Repair Steam and High Temperature Hot Water (HTHW) Line D partial in Area A using Natural Gas (N.G.) Boilers for 22 buildings. Includes new 8" diameter N.G. supply piping and in most cases separate N.G. boilers at or adjacent to each building. Affected facilities are buildings 15, 16, 17, 19, 21, 22, 23, 27, 28, 29, 55, 69, 109, 110, 113, 138, 140, 142, 143, 151, 152, 219, and infrastructure facilities 07199 (Heat distribution mains) and 07187 (natural gas mains). This project addresses roughly ½ of facilities served by existing heat distribution Line D.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents