Similar Projects
Biosolids Holding Tank - Phase 2 - WW042 - City of Naperville
Infrastructure
Conception
$1,500,000 CJ est. value
Naperville, IL 60564

Deep Well Rehabilitation - Well #16 - PWWS013.0-16 - Village of Mount Prospect
Renovation, Infrastructure
Conception
$535,000 CJ est. value
Mount Prospect, IL 60056

Water Tank Removal and Upgrades - WW 0001A - Village of Palatine
Infrastructure
Design
$4,500,000 CJ est. value
Palatine, IL 60067

Mark Viii Tank Pad and Shelter
Infrastructure
Design
$500,000 CJ est. value
Rock Island, IL 61299

MWRD Phosphorus Removal Modifications to Battery D O'Brien Water Reclamation Plant
Infrastructure - 2,250 SF
Bidding
$20,140,985 CJ est. value
Skokie, IL 60076

2023 Modifications to Leachate Collection System Landfill #3
Renovation
Bidding
$1,400,000 CJ est. value
Oneida, IL 61467

Construction Repair, Cleaning and Painting of Existing 200,000 Gallon Elevated Storage Tank
Infrastructure, Alteration
Post-Bid
Carbondale, IL

WTP 11 Brine Tank Rehabilitation
Infrastructure
Post-Bid
Huntley, IL

0.75 MG Central Water Tower
Infrastructure
Results
$2,500,000 est. value
North Aurora, IL

DHS AMHC SP- Expansion Tank
Infrastructure
Results
Alton, IL 62002

Sewage Storage Basin Construction - 21A12 - North Shore Water Reclamation District
New Construction, Infrastructure
Conception
$9,730,800 CJ est. value
Gurnee, IL 60031

Ground Storage Tank & Elevated Tank Rehabilitation Project
Renovation
Bidding
$70,000 CJ est. value
Chicago, IL 60604

Proposed Water System Improvements 2019
Infrastructure
Post-Bid
Herrick, IL

Phase 57 Water Tower
Infrastructure
Results
$700,000 est. value
IL

Elevated Tank Re-coating and Repair Program - WCI-02 - Village of Wheeling
Renovation
Conception
$1,500,000 CJ est. value
Wheeling, IL 60090

Last Updated 05/16/2023 02:33 PM
Project Title

Church Road Elevated Storage Tank Rehab

Physical Address View project details and contacts
City, State (County) Cahokia, IL 62206   (Saint Clair County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,180,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes rehabilitation of existing 500,000 gallon welded steel multi-leg elevated water storage tank including full containment; sandblast clean and paint tank interior and exterior; apply exterior logo / lettering; lead paint abatement; clean and remove silt / sediment; removal and proper disposal of waste; post signs; clean off top of tank foundations; remove and replace grout at base of tank foundation connections; apply sealant to tank foundations; clean, tighten and tack weld anchor bolts and nuts; remove and replace riser manway and hinge or davit arm assembly; install riser freeze proof drain valve; overflow pipe duck bill check valve; concrete splash pads / swales and rock blanket transitions; remove and replace exterior access ladder, standoff supports, safety climb system and lockable ladder gate / guard; remove, modify and adjust stay rod bands, repairs and riser clips; remove and replace balcony handrail; drill weep holes in balcony; install new secondary shell manway and hinge or davit arm assembly; install hinge or davit arm assembly to existing primary shell manway; install new secondary roof access hatch and hinge assembly; install new secondary interior access ladder, standoff supports and safety climb system; remove and replace existing primary interior access ladder, standoff supports and safety climb system; install safety handrail around top of tank; install safety handrail around top of riser pipe; remove cathodic protection system and patch / close roof openings; install seam seal on all un-welded interior roof lap seams; install complete potable submersible water storage tank hydrodynamic mixing system; install complete electrical and control systems work including electrical service upgrade work; tank disinfection; all appurtenances and minor details necessary to make the completed improvements operational with the project specifications. idders will be required to provide Bid security of a sum no less than 5 percent of the Bid Sum. The bid security shall be either certified check, cashier's check, bank money order or bid bond issued by surety licensed to conduct business in the State of Illinois. Hereinafter this bid security shall be referred to as the bid bond. Submit one copy of your Bid on the Bid Form provided. Bidders may supplement this form as appropriate. Your Bid submittal will be required to be under a condition of irrevocability for a period of Ninety (90) days after submission. The Owner reserves the right to accept or reject any or all Bids or any part thereof, to waive any informality in bidding, and to accept bids deemed most favorable to the Owner. Latest Time to Submit Request for Interpretation: April 20, 2023 Questions shall be directed to: e-mail: zyork@hurst-rosche.com lheibel@hurst-rosche.com

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents