Similar Projects
Harvey-Swanson Elementary Renovations
Renovation
Conception
Ortonville, MI 48462

Oakwood Elementary Renovations
Renovation
Conception
Ortonville, MI 48462

Central High School and Grand Rapids Montessori Elementary Renovation & Site Improvements
New Construction, Renovation
Design
$25,000,000 est. value
Grand Rapids, MI 49503

New Career Technical Education Center
New Construction - 160,000 SF
Design
Kalamazoo, MI

Michigan Math and Science Academy
Renovation - 59,680 SF
Post-Bid
Warren, MI 48092

Construction Renovation Clio Elementary
New Construction, Renovation
Post-Bid
Clio, MI 48420

Thornapple Elementary Renovations- Bid Package 07
Renovation
Results
Grand Rapids, MI 49546

Summer 2021 Mechanical Upgrades and Facility Improvements
Results
Monroe, MI 48161

ATAP Early Childhood Gymnasium and Classroom Renovations
Renovation - 9,691 SF
Construction
$700,000 est. value
Pontiac, MI 48341

Kitchen Renovations at Mcglinnen Elementary School Parker Elementary School Rainbow Elementary School
Renovation
Post-Bid
Clinton Township, MI 48035

Bid Package 4 - Robert Kerr Elementary School Addition
Addition
Results
Durand, MI 48429

Airport Community Schools - Eyler Elementary Parking Lot
Renovation, Alteration
Post-Bid
Carleton, MI

Waterford Village Elementary School Demolition
Demolition
Results
Waterford Township, MI 48329

Ludington Area Schools New Elementary
New Construction
Post-Bid
$30,000 est. value
Ludington, MI 49431

Burger Baylor Gutters Replacement
Alteration
Results
Inkster, MI 48141

Last Updated 01/06/2023 09:07 AM
Project Title

Elementary School - 2022 Bond - Mancelona Public Schools

Physical Address View project details and contacts
City, State (County) Mancelona, MI 49659   (Antrim County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project work includes main entrance security improvements, upgrade fire alarm system, kitchen/gym remodel, boiler placement, and sidewalk repair. As of January 6, 2023, this project is in the design phase. An architect and construction manager have been selected for the project. A firm construction timeline has not been released. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents