Similar Projects
Reported | 06/07/2022 12:00 AM |
Project Title | NRCS Erosion Control Project - Farmer Street and Clover Lane Stabilization |
Physical Address | View project details and contacts |
City, State (County) | Vicksburg, MS 39183 (Warren County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $400,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project includes soldier pile stabilized embankments and drainage improvements as indicated in the drawings, specifications, and other contract documents. The above general outline of features of work does not in any way limit the responsibility of the Contractor to perform all work and furnish all parts, labor, equipment, and materials required by the specifications and the drawings referred to therein. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |