Similar Projects
Traffic Signal/Controller Maintenance
Bidding
Enfield, CT

Street Sign Materials and Traffic Safety Equipment
Infrastructure
Bidding
Danbury, CT

Arch Street Corridor Adaptive Signal Control Technology
Post-Bid
Greenwich, CT

Maintenance and Protection of Traffic - Concrete Tunnel Liner Assessment
Post-Bid
Hamden, New Haven, Woodbridge, CT 06525

Norwalk Phase III - Signal Controller/Signal Upgrade
Results
Norwalk, CT 06851

2020 On-Call Traffic Flagging Services
Term Contract
Results
Mansfield, CT

Pedestrian Crossing Improvements
Infrastructure
Post-Bid
Salisbury, CT

Installation and Revision of Traffic Control Signals
Results
$2,500,000 to $4,999,999 est. value
Thomaston, CT 06787

Installation and Revision of Traffic Control Signals in various Towns District 3
Infrastructure
Post-Bid
Newington, CT

Citywide Traffic Signal Modernization, Phase II
Results
Less than $2,672,728 est. value
New Britain, CT

Installation and Revision of Traffic Control Signals in District 3
Infrastructure
Post-Bid
$2,500,000 to $4,999,999 est. value
New Haven, CT

Installation and Revision of Traffic Control Signals
Results
$2,500,000 to $4,999,999 est. value
Andover, Ashford, Berlin, Bloomfield, Bolton, Bozrah, Bristol, Brooklyn, Chester, Coventry, Cromwell, Durham, East Hartford, East Lyme, East Windsor, Ellington, Enfield, Essex, Franklin, Glastonbury, Hartford, Lyme, Manchester, Mansfield, Marlborough, Meriden, Middlefield, Middletown, New Britain, Newington, Plainfield, Putnam, Rocky Hill, Salem, Somers, South Windsor, Southington, Stafford, Tolland, Union, Vernon, West Hartford, Wethersfield, Willington, Windsor, Windsor Locks, Wolcott, CT 06232

Replace and Upgrade Coordinated Traffic Signal System (CTSS) Equipment
Results
$2,500,000 to $4,999,999 est. value
New Britain, Newington, Wethersfield, CT 06050

Downtown Traffic Signal Improvements at Phase I
Results
$2,000,000 to $4,000,000 est. value
Hartford, CT

Citywide Communications Upgrade
Results
$500,000 to $1,000,000 est. value
Hartford, CT

Reported 08/05/2021 12:00 AM
Project Title

Traffic Control Signals and Intersection Improvements at Phase II

Physical Address View project details and contacts
City, State (County) Hartford, CT   (Hartford County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $3,000,000 to $6,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Includes the complete replacement or modification of traffic control signal equipment at seven (7) signalized intersections in the City of Hartford. This includes the following intersections: Wethersfield Avenue at Brown Street and Airport Road; Wethersfield Avenue at Main Street and Wyllys Street; Washington Street at Retreat Avenue and Vernon Street; Market Street at Trumbull Street and I-91 Ramps; Market Street at North Morgan Street and I-84 Ramps; Market Street at South Morgan Street and Parking Garage Exit; Columbus Boulevard at State Street and Route 2. The four (4) Bid Alternate intersections include the following: West Boulevard at Sisson Avenue and I-84 Ramps; Washington Street at Webster Street/New Britain Avenue/Barnard Street; Market Street at Pleasant Street; Main Street at Morgan Street South and Chapel Street South. The project includes installing new traffic control signal equipment; installation of pavement markings and signs; mast arms, new handicapped ramps, and where necessary, minor storm drainage modifications to accommodate pedestrian ramps.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents