Similar Projects
Last Updated | 02/12/2020 03:08 AM |
Project Title | Preservation - Aiken County |
Physical Address | View project details and contacts |
City, State (County) | SC (Aiken County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Removal & Disposal Of Existing Pavement 110.000 Sy Borrow Excavation 358.000 Cy Maintenance Stone 11.700 Ton Liquid Asphalt Binder Pg64-22 189.657 Ton Full Depth Asph. Pav. Patching 6" Unif. 150.000 Sy Full Depth Asph. Pav. Patching 8" Unif 1,020.000 Sy Milling Existing Asphalt Pavement 1.25" 44,950.000 Sy Milling Existing Asphalt Pavement (Variable) 3,375.000 Sy Hot Mix Asphalt Surface Course Type d 2,976.683 Ton Preventative Maintenance Surface Treatment 26,394.134 Sy Driveway Paving-Surface Type d 33.750 Ton Permanent Construction Signs (Ground Mounted) 1,980.000 Sf 4" White Broken Lines(Gaps Excl.)Perm.Pvmt.Marking 4,300.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Perm.Pvmt.Marking 1,750.000 Lf 8" White Solid Lines Perm.Pvmt.Markings 3,185.000 Lf 12in x 18in White Triang. Yield Bar (Gaps Exc)Perm.Pvmt.Mark 35.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Perm.Pvmt.Marking 700.000 Lf White Single Arrows (Lt, Strght, Rt) Perm.Pvmt.Marking 8.000 Ea White Word Message "Only" -Perm.Pvmt.Marking 6.000 Ea White Combination Arrows(Str&Rt.Or Str&Lt)Perm.Pvmt.Marking 2.000 Ea White Lane Drop Arrow(Lt.Or Rt.)Perm.Pvmt.Marking 2.000 Ea 4" Yellow Broken Lines(Gaps Exc)Perm.Pvmt.Marking 3,350.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Perm.Pvmt.Marking 17,900.000 Lf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 8,660.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 3,850.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 3,670.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 1,770.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 16.000 Ea White Word Message "Only"-Fast Dry Paint 12.000 Ea White Combination Arrow(Str.& Rt.Or Str.& Lt.)Fast Dry Paint 4.000 Ea White Lane Drop Arrow (Left Or Right)-Fast Dry Paint 4.000 Ea Handicap Symbol - Fast Dry Paint 8.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 6,700.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 35,800.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 1,730.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 175.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 320.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 471.000 Ea 4" White Broken Lines- (Gaps Excld) - Single Component Hybridized Polymer– 20 Mils 30.000 Lf 4" White Solid Lines-(Pavement Edge Lines)-Single Component Hybridized Polymer–20 Mils 350.000 Lf 24" White Solid Lines-(Stop/Diagonal Lines)-Single Component Hybridized Polymer–20 Mils 185.000 Lf Furnish & Install 1.0" Schedule 80 Pvc Conduit 100.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 6,200.000 Lf Sawcut For Loop Detector 2,350.000 Lf Concrete Sidewalk(4" Uniform) 60.000 Sy Detectable Warning Material 85.000 Sf Pedestrian Ramp Construction 50.000 Sy Surface Applied Detectable Warning 450.000 Sf Permanent Grassing For Non-Permitted Resurfacing Projects 1.736 Acre |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |