Similar Projects
2020 ADA Ramp Upgrades Various Locations
Bidding
Altoona, PA 16601

Improvements to Hamilton Park Recreation Area, Kettle Street and East Cherry Avenue - Phase 2
Post-Bid
Altoona, PA

Maintenance and Protection of Traffic
Post-Bid
Duncansville, PA 16635

Beech Avenue Drainage Repairs
Results
Altoona, PA

2019 DF Blair Box Culvert
Results
$100,000 to $199,999 est. value
PA

Paw Paw Road Cross Pipe Replacement
Post-Bid
PA

Logan Avenue Streetscape
Results
Tyrone, PA 16686

Stetter Road Structure Replacement
Results
Less than $409,000 est. value
Bellwood, PA

SR 36 Buckhorn Slide
Results
$200,000 to $499,999 est. value
PA

SR 866 Culvert Rehabilitation Project
Results
Williamsburg, PA

Resurfacing of the Main Front Parking Lot and Access Drives
Results
Tyrone, PA

Spencer Run Streambank Stabilization Project
Results
Duncansville, PA

2019 Penn Vale ADA Improvements Project
Results
Williamsburg, PA 17701

City Hall Parking Lot Improvements
Results
Altoona, PA

Union Avenue Curb and Sidewalk Project
Results
Altoona, PA 16601

Last Updated 09/26/2019 10:13 AM
Project Title

Roof Drain And Sidewalk Replacement

Physical Address View project details and contacts
City, State (County) Tyrone, PA 16686   (Blair County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Project consists of replacing underground piping connecting to the roof drain system and replacement of portions of the sidewalk system at Bell Court, 1311 North Cambria Street, Bellwood, PA and Cold Springs,105 Cranberry Street, Tyrone, PA (Snyder Township), BlairCounty,Pennsylvania. The Prime Contract shall consist of: Contract No. GC-1: General Construction Work. Bids must be on a combined lump-sum basis; separate Bids for individual trades will not be accepted. Project is to be substantially completed within 90 calendar days from the date of award of Contract.
Details
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents