Similar Projects
Spring Creek Park Subdivision
New Construction
Conception
Kalispell, MT 59901

Madison Food Park Cheese Processing Facility
New Construction, Infrastructure
Conception
$9,000,000 CJ est. value
Great Falls, MT 59401

Junegrass Place
New Construction
Design
$4,000,000 est. value
Kalispell, MT 59901

Flathead Valley Youth Center - Phase 4
New Construction
Design
$25,000,000 est. value
Kalispell, MT 59901

RFQ D/B - Hardin Rest Area Project
Infrastructure
Bidding
$130,000,000 CJ est. value
Hardin, MT 59034

Delp Check Long Crested Weir
Demolition, Infrastructure
Bidding
$475,000 CJ est. value
Saint Xavier, MT 59075

Lewistown Fire Warehouse Addition
Addition, Demolition, Build-out, Renovation, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Lewistown, MT 59457

Construction of the Stone Child College Extension Building Project
Infrastructure
Post-Bid
$1,000,000 est. value
Box Elder, MT 59521

2021 Water System Improvement Project
Infrastructure
Results
$4,499,772 CJ est. value
Bigfork, MT 59911

Lake McDonald Utility Relocation
Infrastructure
Results
$15,000,000 to $20,000,000 est. value
Kalispell, MT

2022 Street Improvement Project
Infrastructure
Construction
$615,307 CJ est. value
Lewistown, MT 59457

406 Spa and Coffee Shop Expansion
Addition, Demolition, Infrastructure - 2,277 SF
Construction
$600,000 CJ est. value
Kalispell, MT 59901

Samaritan House Expansion
New Construction, Infrastructure, Build-out
Pending Verification
$6,000,000 CJ est. value
Kalispell, MT 59901

Samaritan House Expansion
New Construction, Infrastructure, Build-out
Pending Verification
$6,000,000 CJ est. value
Kalispell, MT 59901

Willow Glen Wash Bay Addition - RB0218-03008 - Flathead County
Addition, Demolition, Renovation, Infrastructure
Conception
$1,026,250 CJ est. value
Kalispell, MT 59901

Last Updated 07/07/2023 04:11 PM
Project Title

Meadowlark Senior Apartments

Physical Address View project details and contacts
City, State (County) Butte, MT 59701   (Silver Bow County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2024
Bids Due View project details and contacts
Estimated Value $9,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 7, 2023, the developer received $6,500,000 in tax credits. Information regarding architect or contractor has yet to be determined. A firm timeline has yet to be announced. Content has made several attempts to the owner for an update, however, they have been unresponsive. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents