Similar Projects
Reported | 09/11/2020 12:00 AM |
Project Title | 2020 Paving Project |
Physical Address | View project details and contacts |
City, State (County) | Beaver Falls, PA 15010 (Beaver County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Mill the bituminous pavement a depth of 1-½" at locations 1,2 and 3. Place Superpave Asphalt Mixture Design, Wearing Course, PG 64S-22, < 0.3 Million ESALs, 9.5 mm Mix, SRL-L (1½” Avg. Depth), Include Tack Coat, at locatons 1,2 and 3. See the attached schedule of work for the quantities associated with each location. Also includes placement of 312 tons of bituminous pavement, 3754 SY of milling and tack coat, and maintenance and protection of traffic Location of Work: 1. Coolidge Street from Boyd Avenue to Cottage Street 2. Ross Avenue from Railroad Street to Harding Street 3. Boyd Avenue from Railroad Street to Coolidge Street |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |