Similar Projects
Headquarters Well Evaluation & Rehabilitation
Term Contract
Bidding

Headquarters Well Evaluation & Rehabilitation
Term Contract
Bidding

Ras Pump System
Post-Bid
Provo, UT 84601

Drilling, Construction and Testing of the Proposed Stewart Ranches Well
Post-Bid
Francis, UT 84036

Water System Drilling, Construction and Testing
Results
Heber, UT

Municipal Water Wellhouse
Results
West Bountiful, UT 84087

Purchase and Deliver Well Surface and Intermediate Casing Forge
Term Contract
Post-Bid
Salt Lake City, UT 84112

Flat Iron Mesa Well House Construction Project
Results
Sandy, UT 84070

Water Treatment- Green Well
Post-Bid
Riverton, UT

4800 North Well Pumphouse
Results
Provo, UT 84606

Drilling Rig and Services for Paradox Basin
Post-Bid
Salt Lake City, UT

Ogden Airport Well House Project
Results
Less than $1,500,000 est. value
Ogden, UT 84405

Scipio Town Well Improvements
Post-Bid
Scipio, UT

Decker Main WWPS Pump Replacement - Phase 2
Results
Less than $450,000 est. value
West Valley City, UT 84119

Walker Lane Well Rehabilitation
Post-Bid
Less than $2,000,000 est. value
Holladay, UT 84117

Last Updated 08/27/2021 08:32 AM
Project Title

Well Rehabilitation for Edgemont Well

Physical Address View project details and contacts
City, State (County) Provo, UT 84604   (Utah County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Edgemont Well is an existing well located at 3598 North 290 East in Provo, Utah. It was drilled in 1965 to a total depth of 535 feet with 20-inch casing from 332 feet and 16-inch casing to 535 feet. The casing was perforated with a Mills knife from 230-305 feet and from 450-515 feet. The pump was set at 220 feet below ground surface. The static water level has averaged about 160 feet. It has been some time since the Edgemont Well Pump was pulled and evaluated. In the summer of 2020, it is suspected that the ground water level dropped below the pump bowels during pumping and the pump shut down. If possible, the City would like to lower the pump enough to keep it submerged during pumping. The alignment and condition of the well casing will affect how feasible this is. Work that can only be ascertained once the well is pulled and the borehole videoed, is not included in the bid schedule. Scope and payment for this work will be negotiated as the need arises.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.