Similar Projects
H266--Monthly Isolation/OR Air Quality Test (Va-22-00008550)
Term Contract
Design
Asheville, NC 28805

FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

Request for Information AE Next Pool 2 Architect-Engineering Services for Design and Construction Support for the Air Force Construction Program
Post-Bid

Request for Information AE Next Pool 2 Architect-Engineering Services for Design and Construction Support for the Air Force Construction Program
Post-Bid

C--IDIQ Contract for Architect-Engineer Services for Design and Engineering Services for Industrial Type Facilities Located Throughout the Naval Facilities Engineering Command AOR, Worldwide
Results
Less than $95,000,000 est. value

C--IDIQ Contract for Architect-Engineer Services for Design and Engineering Services for Industrial Type Facilities Located Throughout the Naval Facilities Engineering Command AOR, Worldwide
Results
Less than $95,000,000 est. value

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Bidding
Less than $98,000,000 est. value

Vertical Region 4- Regional Architect and Engineering Indefinite Delivery Indefinite Quantity Contracts
Post-Bid
$100,000 to $30,000,000 est. value

Geotechnical Engineering Services
Results
$500,000 to $2,000,000 est. value

Detention Center Capacity Restoration Program (Dccrp)
Term Contract
Bidding

Indefinite Delivery Indefinite Quantity Contract for Fire Protection Design and Engineering Services for Projects Throughout the Naval Facilities Engineering Command, Mid-Atlantic's Area of Responsibility (AOR)
Post-Bid

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

C1da--EHRM Infrastructure Upgrades - Asheville, NC
Term Contract
Bidding
Asheville, NC 28805

Architect-Engineer Indefinite Delivery/Indefinite Quantity Contract For the States Covered by EPA Regions 1 through 4
Post-Bid
Less than $40,000,000 est. value

Reported 01/11/2022 12:00 AM
Project Title

C223--Replace RO System for SPS

Physical Address View project details and contacts
City, State (County) Asheville, NC 28805   (Buncombe County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF WORK: This project requires the services of an architectural engineering firm (AE) having special knowledge of hospital design. The AE must have experience with Mechanical Engineering with regards to Sterile Processing Reverse Osmosis Systems. Intent This project is intended for the d design for the removal and replacement of the Sterile Processing Reverse Osmosis System, Charles George VAMC, Asheville, NC. A/E will investigate the existing conditions at the main building (Building 47) Sterile Processing Service, review Reverse Osmosis (RO) System existing documentation, review the latest testing and water usage in the RO System. A/E will design a new RO System that meets the current and future needs of the Sterile Processing Service Unit. Reverse Osmosis Deionized (RO / DI) Purified Water: Water suitable for sterile processing applications as required by AAMI TIR 34. RO / DI purified water is required for the final rinse cycle of instrument washer-decontaminators, at the clean-up sinks, and is used in ultrasonic cleaners. Requirements The AE selected is expected to: Part Ia Preparation of Existing Conditions and Conceptual Design Investigative Services: Preparation of existing conditions plan and conceptual design which includes site investigation for mechanical, plumbing, and environmental hazards, such as suspect ACM, other hazardous materials. Work will consist of A/E personnel crawling in crawlspaces, removing ceiling tile and tracing ductwork above ceilings, and tracing ductwork in the building penthouse. Perform project site investigation in accordance with the Site Investigations section of the Scope of Work. Physically survey as well as review record drawings of the existing building. Inform CO/COR of supplemental information gathering that may be required. Conduct on-site work session with User Group and other members of the Integrated Project Team to discuss conceptual options. Describe all measures available to achieve the project objectives, including the benefits and drawbacks of each measure, to guide decisions by the facility during schematic design. The decision of which alternatives to select for the construction project rests with the VA. Develop and describe a construction strategy that allows existing functions to continue during Construction. Develop this strategy in development of construction documents. Participate in a conference call after VA has completed Schematic Design review AE shall review needs identified by the IPT for the area under consideration for design and provide recommendations. In addition, the project shall be phased to minimize the impact to the Medical Center operations and patient care. Prior to submission of schematic design material, the AE shall meet with the VAMC s COR to discuss proposed phasing requirements for the project. These phasing requirements shall describe the general sequence of the project work, estimated project duration, and what VA constraints will exist that will influence the Contractor's approach to the construction project. The AE shall be responsible for documenting the phasing requirements. The AE shall make site visits as required to determine existing as-built conditions affecting this project. Information, including drawings and other documentation, provided to the AE shall be used as reference only. The AE is responsible for verifying all existing site conditions to include but not be limited to: crawling in crawlspaces, looking above ceilings and the building penthouse. Coordinate visits with the COR as assigned at the NTP. The AE shall arrange for and oversee the performance of such investigations necessary for the proper design of the project. AutoCAD background drawings shall be provided by the VA upon request if available and shall be used as reference only. The AE shall field verify every aspect that relates to the project. Perform Photographic Documentation during Investigative Services; files are to be maintained for future reference of existing conditions for construction documents and unforeseen unit costing basis. The Contractor shall prepare digital photo documentation of construction work, including sites, buildings, and field activities. Digital photos shall be submitted in JPEG format to the project website, and to a resolution sufficient and appropriate for the type of work photographed. The Contractor shall provide an index for each set of photographs submitted identifying the contractor, base, facility, project number, date, and a brief description. The Contractor shall coordinate photography of any kind through the COR. The AE shall complete all necessary site investigations prior to the 15% Schematic Design submission. Part Ib Preparation of Contract Drawings and Specifications Design Development: Preparation and submission of construction bid documents, interim design document submittals, and the final construction bid documents at the completion of the design development process in accordance with the Design Package Submission Schedule section. Design document packages shall contain a complete set of documents as specified in the Design Requirements/ Submissions section of this scope of work

Details

Architectural, Renovation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents