Similar Projects
Pavement Painting
Infrastructure
Results
$63,596 CJ est. value
Provo, UT 84601

Kearns High School, Exterior Painting
Alteration
Results
$200,000 est. value
Kearns, UT 84118

Avenna Center Exterior Paint (Burns Arena, Smith Computer Center, Cox Auditorium, Burns Maintenance)
Alteration
Results
$200,000 est. value
Saint George, UT 84770

Painting and Wallcovering services
Term Contract
Post-Bid
Salt Lake City, UT 84111

2023 Roadway Striping Contract
Infrastructure
Post-Bid
$500,000 CJ est. value
Herriman, UT 84096

Bridge Painting Project
Infrastructure
Post-Bid
$70,000 CJ est. value
Coalville, UT 84017

City Hall Interior Paint
Alteration
Post-Bid
$100,000 est. value
Eagle Mountain, UT 84005

Painting Contractor- Contract
Term Contract
Post-Bid
Farmington, UT 84025

Painting All Our Schools
Renovation
Post-Bid
$60,000 CJ est. value
Delta, UT 84624

Romney Paint and Stucco Repair
Alteration
Post-Bid
$50,000 est. value
Salt Lake City, UT 84111

Water Tank and Pipe Painting
Alteration
Post-Bid
Riverton, UT

Painting of Midway City Office Building Basement
Renovation
Post-Bid
$144,000 CJ est. value
Midway, UT 84049

Paint-Striping of Up to 1,000,000 Linear Feet of Paint Lines on County Roads
Renovation
Post-Bid
$50,000 CJ est. value
Wellington, UT 84539

Painting Civic Center Auditorium
Alteration
Post-Bid
Riverton, UT 84065

Painting and Cleaning
Alteration
Post-Bid
Salt Lake City, UT

Last Updated 06/16/2023 03:39 PM
Project Title

Painting of Apartments at the University of Utah

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84108   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $127,300 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

1.0 Scope of work: Painting of Apartments at the University of Utah, University Student Apartments (USA) & Sunnyside Apartments. 1. Vendor must have the abilities to: a. Complete up to six (6) apartments per day, Average is usually four (4) apartments per day b. Respond promptly to the needs of University Student Apartments within 24 business hours of being notified c. Please see Attachment “B” (Floor Plan Configurations) for more detail regarding floor plan designs and basic square footage estimates. USA will provide all paint. The paint is latex based. Safety Data Sheets are available on the paint as needed. Vendor will pick up paint at the USA Stockroom. All paint will be provided in 5 gallon pails. The USA Stockroom has a paint shaker and will shake paint as needed. 1. No paint spraying will be allowed except when requested by University Student Apartments Maintenance to paint textured ceilings. All other applications will be cut and roll. 2. Large repairs will be done by University Student Apartments prior to painting. Paint bids/quotes submitted will include, but are not limited to the following: • Removal of small nails • Minor patch and sanding • Removal of light switch and receptacle covers prior to painting • Mask around door trim and cabinets • Cover appliances • Protect flooring 3. The painting proposal consists of apartments in various building styles; Sunnyside Apartments Cedar and unscheduled painting as needed. Attachments will show the various building configuration layouts. A visual inspection will be made available upon request. 4. Additional Information: a. Sunnyside apartments will include painting of all walls. b. Cedar apartments will include the painting of all walls. Doors and ceilings will be as requested.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents