Similar Projects
B and O Building Exterior Restoration and Cleaning
Renovation
Design
Wheeling, WV 26003

Puskar Center Silver Lot Improvements
Post-Bid
Morgantown, WV 26505

Turnkey Construction of A New Shooting Sports Venue
Results
$429,100 est. value
Morgantown, WV 26506

Jackson's Mill Yurts Bath House Addition
Addition
Results
Morgantown, WV 26506

Campbell Hall 4th Floor Renovation
Construction
$614,700 est. value
West Liberty, WV 26074

Development of Kenamond and Turner Halls, Dining Hall, Gardiner Hall and Perimeter Grounds on the East Campus
Results
Shepherdstown, WV 25443

Animal Research Facility Expansion - Renovation of Two Existing Teaching Laboratories
Renovation - 3,900 SF
Results
Huntington, WV 25755

WVU HSC Dental Clinic Renovation
Renovation
Results
Morgantown, WV 26506

HSC Human Gift Registry Relocation Project
Renovation
Results
Morgantown, WV 26505

Radiography Lab
New Construction
Results
Wheeling, WV

Engineering Science Building G85 Maker Space
Renovation
Results
Morgantown, WV

MCA South- Renovations Tech Center and Maclin Hall
Renovation
Results
Montgomery, WV 25136

Bid Package No 1 Hangar 13 Envelope Renovations - Marshall University
Renovation
Results
Huntington, WV 25755

HSC Immunology Lab Renovation
Renovation - 2,720 SF
Results
Morgantown, WV

Hal Greer Memorial Plaza
New Construction
Results
Huntington, WV

Last Updated 11/02/2021 10:12 AM
Project Title

Classroom Renovations Science Building at Marshall University

Physical Address View project details and contacts
City, State (County) Huntington, WV 25755   (Cabell County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work will include renovations to Classroom 266A. The remodeling work will include selective demolition, new flooring, paint, suspended ceilings, LED lights, power, data, rework of HVAC ducts, sprinkler piping, and minor metal stud and gypsum board wall construction. The room will be outfitted with existing items currently stored on campus by the Owner. Those repurposed existing items include wood laboratory benches, wall casework, epoxy tops, articulating exhaust snorkels, and ducted fume hood.

Details

College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents