Similar Projects
2022 Street Improvements
Infrastructure
Bidding
$500,000 est. value
Estacada, OR

Trillium Park Drive, Phase 2 - Roadway Abandonment
Infrastructure
Bidding
$520,000 est. value
Oregon City, OR 97045

I-205 Improvements 1A - Or43 To Or213 Section of the East Portland Freeway
Infrastructure
Post-Bid
$30,000,000 est. value
OR

Salmonberry Drive Paving Project
Infrastructure
Post-Bid
$200,000 est. value
Oregon City, OR 97045

SAFE SSMP FY21 Improvement Project
Infrastructure
Results
$3,056,000 to $3,565,000 est. value
Milwaukie, OR

OR211 Canby Marquam Highway Project on The Woodburn
Infrastructure
Results
$100,000 to $500,000 est. value
OR

District-wide Installation of Gravel Pads for Storage Shed Project
Infrastructure
Bidding
$50,000 est. value
Milwaukie, OR

Boeckman Road Corridor Project
Infrastructure
Post-Bid
$26,000,000 to $28,000,000 est. value
Wilsonville, OR 97070

South End Road MP 3.8
Infrastructure
Results
$330,000 to $340,000 est. value
Oregon City, OR

Pavement Management Program: 2022 Pavement Rehabilitation Projects
Infrastructure
Post-Bid
$5,250,000 est. value
Lake Oswego, OR

Webster Area Paving Project
Infrastructure
Results
$775,000 est. value
Oregon City, OR

2022 Street and Utility Improvements
Infrastructure
Post-Bid
$1,500,000 to $1,700,000 est. value
Canby, OR

4M Bikeway - SE Mill-Millmain-Main from 130th to 174th
Infrastructure
Results
Portland, OR

Skyline Partition Project
Infrastructure
Post-Bid
$190,000 est. value
West Linn, OR 97068

Ten Eyck Road Improvements Project
Alteration
Results
$70,000 to $80,000 est. value
Oregon City, OR

Last Updated 05/29/2022 10:57 PM
Project Title

2022 Street Improvement Project

Physical Address View project details and contacts
City, State (County) Happy Valley, OR   (Clackamas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $725,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes reconstruction, repair and overlay street improvements for five (5) streets: Proposed work includes the following: Schedule 'A' (SE 157th Avenue) includes the following proposed work: Ø Crack Sealing: 98,742 +/- lineal feet Ø Slurry Sealing: 104,114 +/- square yard Ø Tree Trimming: 1,373 +/- trees Ø Striping: 27 +/- square feet of 12" stop bar, 1,640 +/- lineal feet of 8" white bike lane, 150 +/- lineal feet of 4" white lane line, 1,566 +/- lineal feet of 4" double yellow center line, 4 (four) bike lane symbols and arrows, 2 (two) turn arrows, Ø ADA Ramp Construction: Removal and construction of 4 (four) ramps Schedule 'B' (SE Isaac Drive) includes the following proposed work: Ø Pavement Grinding 2" Depth: 1,411+/- square yards, Ø Overlay Street to 2" Thickness: 1,411 +/- square yards (160 tons) Ø Speed Bumps: Construction of 2 (two) speed bumps, Ø Striping: 2 +/- speed bumps, 12 +/- square feet of 12" stop bar, and Ø ADA Ramp Construction: Removal and construction of 1 (one) ramp Schedule 'C' (SE Kimberly Court) includes the following proposed work: Ø Pavement Grinding 2" Depth: 2,133 +/- square yards, Ø Overlay Street to 2" Thickness: 2,133 +/- square yards (240 tons), Ø Speed Bump: Construction of 1 (one) speed bump, Ø Striping: 1 +/- speed bump, 10 +/- square feet of 12" bar, and Ø ADA Ramp Construction: Removal and construction of 5 (five) ramps, Schedule 'D' (SE 139th Avenue) includes the following proposed work: Ø Pavement Grinding 2" Depth: 1,150 +/- square yards, Ø Overlay Street to 2" Thickness: 1,150 +/- square yards (128 tons), and Ø ADA Ramp Construction: Removal and construction of 2 (two) ramps Schedule 'E' (SE 140th Place) includes the following proposed work: Ø Pavement Grinding (2"+/-): 238 +/- square yards, Ø Overlay Street to 2" Thickness: 1,058 +/- square yards (118 tons), Ø 3/4"-0 Aggregate Shoulders, 2" Thickness: 27 +/- tons, Ø Striping: 10 +/- square feet of 12" bar Construction

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents