Last Updated | 05/29/2022 10:57 PM |
Project Title | 2022 Street Improvement Project |
Physical Address | View project details and contacts |
City, State (County) | Happy Valley, OR (Clackamas County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $725,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work includes reconstruction, repair and overlay street improvements for five (5) streets: Proposed work includes the following: Schedule 'A' (SE 157th Avenue) includes the following proposed work: Ø Crack Sealing: 98,742 +/- lineal feet Ø Slurry Sealing: 104,114 +/- square yard Ø Tree Trimming: 1,373 +/- trees Ø Striping: 27 +/- square feet of 12" stop bar, 1,640 +/- lineal feet of 8" white bike lane, 150 +/- lineal feet of 4" white lane line, 1,566 +/- lineal feet of 4" double yellow center line, 4 (four) bike lane symbols and arrows, 2 (two) turn arrows, Ø ADA Ramp Construction: Removal and construction of 4 (four) ramps Schedule 'B' (SE Isaac Drive) includes the following proposed work: Ø Pavement Grinding 2" Depth: 1,411+/- square yards, Ø Overlay Street to 2" Thickness: 1,411 +/- square yards (160 tons) Ø Speed Bumps: Construction of 2 (two) speed bumps, Ø Striping: 2 +/- speed bumps, 12 +/- square feet of 12" stop bar, and Ø ADA Ramp Construction: Removal and construction of 1 (one) ramp Schedule 'C' (SE Kimberly Court) includes the following proposed work: Ø Pavement Grinding 2" Depth: 2,133 +/- square yards, Ø Overlay Street to 2" Thickness: 2,133 +/- square yards (240 tons), Ø Speed Bump: Construction of 1 (one) speed bump, Ø Striping: 1 +/- speed bump, 10 +/- square feet of 12" bar, and Ø ADA Ramp Construction: Removal and construction of 5 (five) ramps, Schedule 'D' (SE 139th Avenue) includes the following proposed work: Ø Pavement Grinding 2" Depth: 1,150 +/- square yards, Ø Overlay Street to 2" Thickness: 1,150 +/- square yards (128 tons), and Ø ADA Ramp Construction: Removal and construction of 2 (two) ramps Schedule 'E' (SE 140th Place) includes the following proposed work: Ø Pavement Grinding (2"+/-): 238 +/- square yards, Ø Overlay Street to 2" Thickness: 1,058 +/- square yards (118 tons), Ø 3/4"-0 Aggregate Shoulders, 2" Thickness: 27 +/- tons, Ø Striping: 10 +/- square feet of 12" bar Construction |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |