Last Updated 01/13/2021 05:22 AM
Project Title

Reconstruction/Rehabilitation - District 6

Physical Address View project details and contacts
City, State (County) (Berkeley, Colleton, Dorchester Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Construction Stakes, Lines & Grades 20.000 Ea Traffic Control 1.000 Ls Railroad Insurance And Flagging 001 1.000 Ls Removal & Disposal Of Existing Pavement 199.470 Sy Removal & Disposal Of Existing Curb 353.000 Lf Unclassified Excavation 375.000 Cy Borrow Excavation 8,927.000 Cy Excavation For Shoulder Paving 115.300 Sta Hauling Of Excavated Shoulder Material 115.300 Sta Additional Rock For Full Depth Reclamation 3,270.500 Ton Cement Modified Recycled Base (10" Unif)-Curing Method b 119,309.312 Sy Cement Modified Recycled Base (12" Unif)-Curing Method b 112,226.932 Sy Portland Cement For Cement Modified Recycled Base Course 8,154.850 Ton Maintenance Stone 338.110 Ton Hot Mix Asphalt Base Course - Type a 684.288 Ton Liquid Asphalt Binder Pg64-22 2,698.383 Ton Full Depth Asph. Pav. Patching 6" Unif. 2,809.000 Sy Full Depth Asph. Pav. Patching 8" Unif 6,144.000 Sy Full Depth Asph. Pav. Patching 10"Unif 24,858.000 Sy Milling Existing Asphalt Pavement 1.5" 12,692.690 Sy Milling Existing Asphalt Pavement 1.75" 37,288.600 Sy Milling Existing Asphalt Pavement 2.0" 85,819.398 Sy Milling Existing Asphalt Pavement (Variable) 8,737.000 Sy Milled-In Rumble Strip 28.970 Mi Hot Mix Asphalt Intermediate Course Type b 4,511.642 Ton Hot Mix Asphalt Surface Course Type b 28,388.549 Ton Hot Mix Asphalt Surface Course Type c 13,643.650 Ton Hot Mix Asphalt Surface Course Type e 424.200 Ton Driveway Paving-Surface Type b 9.000 Ton Driveway Paving-Surface Type c 1,358.000 Ton Warm Mix Asphalt Intermediate Course Type b - Special 88.000 Ton Permanent Construction Signs (Ground Mounted) 5,480.000 Sf Pave. Mark.(Temp-Paint)12inx18in White Triangle Yield Bar 128.000 Lf 4" White Broken Lines(Gaps Excl.)Perm.Pvmt.Marking 7,328.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Perm.Pvmt.Marking 169,291.000 Lf 8" White Solid Lines Perm.Pvmt.Markings 7,779.000 Lf 12in x 18in White Triang. Yield Bar (Gaps Exc)Perm.Pvmt.Mark 32.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Perm.Pvmt.Marking 3,207.000 Lf White Single Arrows (Lt, Strght, Rt) Perm.Pvmt.Marking 51.000 Ea White Word Message "Yield"-Perm.Pvmt.Marking 1.000 Ea White Word Message "Only" -Perm.Pvmt.Marking 48.000 Ea White Combination Arrows(Str&Rt.Or Str&Lt)Perm.Pvmt.Marking 4.000 Ea Railroad Crossing Symbols - Perm.Pvmt.Marking 7.000 Ea 4" Yellow Broken Lines(Gaps Exc)Perm.Pvmt.Marking 13,180.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Perm.Pvmt.Marking 114,463.000 Lf 12" Yellow Solid Lines - Perm.Pvmt.Marking 50.000 Lf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 25,422.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 574,536.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 24,886.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 9,612.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 178.000 Ea White Word Message "Only"-Fast Dry Paint 170.000 Ea White Combination Arrow(Str.& Rt.Or Str.& Lt.)Fast Dry Paint 16.000 Ea Railroad Crossing Symbols - Fast Dry Paint 21.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 46,750.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 370,815.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 3,204.000 Lf 12" Yellow Solid Lines - Fast Dry Paint 150.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 621.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 86.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 1,851.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 630.000 Lf Furnish & Install 2.0" Schedule 80 Pvc Conduit 260.000 Lf Furnish & Install No. 14 Copper Wire, 8 Conductor (Black) 300.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 17,916.000 Lf Furnish & Install Flush Mounted Wireless Sensor 32.000 Ea Sawcut For Loop Detector 6,901.000 Lf f&i-13"x24"x18"d.Elec.Flush Undgrd.Enclos-(Str.Poly.Conc.)Hd 11.000 Ea Remove Flush Mounted Wireless Sensor 64.000 Ea Adjust Drop Inlet Adjust d. i. 3.000 Ea Concrete Curb And Gutter(1`-6") Ogee 105.000 Lf Concrete Sidewalk(4" Uniform) 63.360 Sy Concrete Sidewalk(6" Uniform) 28.000 Sy Detectable Warning Material 340.000 Sf Concrete Flume 1.000 Ea Pedestrian Ramp Construction 468.000 Sy Surface Applied Detectable Warning 60.000 Sf Permanent Grassing For Non-Permitted Resurfacing Projects 20.111 Acre Silt Fence 3,900.000 Lf

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents