Similar Projects
RFQ D/B - NC3 Alert Campus
New Construction, Infrastructure - 143,074 SF
Bidding
$75,000,000 CJ est. value
Offutt AFB, NE 68113

RFP D/B - OSS/SERE Ops Facility
New Construction, Infrastructure - 50,000 SF
Bidding
$100,000,000 CJ est. value
Offutt AFB, NE 68113

Children's Physicians La Vista - Building Package
New Construction, Infrastructure - 10,095 SF
Sub-Bidding
$2,150,000 CJ est. value
La Vista, NE 68128

District 2 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

SID 264, Shadow Lake Paving Maintenance 2022
Infrastructure
Post-Bid
$160,000 est. value
Papillion, NE 68046

US-6/Harrison ST
Infrastructure
Results
$5,000,000 est. value
NE

Concrete Pavement-N-50 / Platteview Road, Springfield
Infrastructure
Results
NE

Stadium Team Meeting Room Building - Papillion LaVista Public Schools
New Construction, Infrastructure - 4,950 SF
Construction
$940,500 CJ est. value
Papillion, NE 68046

Nebraska Crossing
Addition, New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Gretna, NE 68028

Nebraska Crossing
Addition, New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Gretna, NE 68028

East La Vista Sewer and Pavement Rehabilitation
Infrastructure
Bidding
$900,000 CJ est. value
La Vista, NE 68128

2022 Paving Reconstruction (Ballena/Tiburon Estates), Sanitary and Improvement District No. 192 of Sarpy County
Infrastructure
Post-Bid
$63,176 est. value
Springfield, NE

2021 Street Reconstruction
Infrastructure
Results
NE

R&R Commerce Park South Additional Phases / Sarpy Industrial / Papillion
New Construction, Infrastructure - 862,000 SF
Pending Verification
$449,000,000 CJ est. value
Richland Viii, NE 68138

Harvest Creek SID 369, Sarpy County Storm Sewer and Paving System - Section I
Infrastructure
Bidding
$6,284,000 CJ est. value
Springfield, NE 68059

Last Updated 10/07/2022 04:06 PM
Project Title

2022 Paving Reconstruction - Phase II Ballena/Tiburon Estates

Physical Address View project details and contacts
City, State (County) Springfield, NE 68059   (Sarpy County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $60,375 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

the furnishing of all labor, materials, use of Contractor's equipment, plant and all else necessary to construct properly all of the improvements within the improvement generally designated 2022 Paving Reconstruction Phase 2 (Ballena/Tiburon Estates), Sanitary and Improvement District No. 192 of Sarpy County, Nebraska. At such hour, or as soon as practicable thereafter, the Board of Trustees of the District will proceed to open in the presence of all bidders and consider the bids received for the furnishing of such labor, materials, and equipment necessary for the proper construction of such improvements. The extent of the work consists of the construction or other effectuation of the items listed below and other related preparatory and subsidiary work from issuance of the Notice to Proceed: Approx. Item_ Description Quantities 1 Remove Existing Pavement and Replace with 9" Uniform Thickness PCC Paving 625 S.Y. 2 Remove and Replace Subgrade, if necessary 20 C.Y. 3 Sod, in place 200 S.F. The Engineer's estimate of the construction or other effectuation of all of such improvements and work is $60,375.00. Each bid must be accompanied in a SEPARATE SEALED ENVELOPE by a certified check drawn on a bank whose deposits are insured by the Federal Deposit Insurance Corporation in the amount of $3,050.00, payable without condition to the Treasurer, Sanitary and Improvement District No. 192 of Sarpy County, Nebraska, or a bid bond for a like amount. As evidence of good faith of the bidder and as agreed upon liquidated damages to the District in the event of the bidder whose proposal is accepted by the Board of Trustees of the District fails to enter into contract within ten (10) days after Notice of Award and furnish acceptable bond to complete the work and pay for all labor done and materials used, such bond to be in the amount of 100% of the total bid price. No bidder may withdraw his proposal for a period of thirty (30) days after the date set for the opening of bids. Sanitary and Improvement District No. 192 of Sarpy County, Nebraska, reserves the right to waive informalities and to reject all or any bids.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents