Similar Projects
Repair/Maintain Airfield Stormwater System Phs II, FGWB 04-0014P2A and FGWB 04-0014P2B
Design
$5,000,000 to $10,000,000 est. value
Marietta, GA

241-301 Hanarry Drive (North) Storm Drain System Replacement Project
Post-Bid
Lawrenceville, GA

Stormwater Utility On-Call Contractors
Post-Bid
Duluth, GA

Water, Waste Water, and Storm Water Run-Off Usage at The Gillem Enclave
Results
Forest Park, GA 30297

FY 2018 Water Main Improvements Project
Results
Less than $2,000,000 est. value
Gainesville, GA

Replacement of Storm Piping
Post-Bid
Macon, GA 31200

Green Infrastructure Design Challenge - Continental Colony Elementary
Results
Atlanta, GA 30331

FGWB 14-0014P2A, Maintain Airfield Stormwater System Phase II & FGWB 14-0014P2B Repair Stormwater System Phase II
Post-Bid
$5,000,000 to $10,000,000 est. value
Marietta, GA

FY 2018 CDBG
Results
Less than $1,397,324 est. value
Cornelia, GA

Railroad Avenue - CDBG 2016 - Storm Sewer and Roadway Improvments
Post-Bid
Cochran, GA 31014

Concrete Pipe
Results
GA

1291 Creek Wood Cove Storm Drain Replacement Project
Post-Bid
Lawrenceville, GA 30046

Edgehill Place Storm Drainage Repair
Results
Johns Creek, GA

Prequalified Contractors List
Post-Bid
East Point, GA

Lakeland Avenue Storm Pipe Repair
Results
Valdosta, GA

Reported 01/10/2020 12:00 AM
Project Title

New Dunbar Road Regional Stormwater Facility

Physical Address View project details and contacts
City, State (County) Byron, GA 31008   (Peach County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Consist of furnishing all labor, materials, tools, equipment, safety equipment, permitting, erosion and sedimentation control measures, taxes, profit, overhead, and other costs and effort required to complete the following: Construction of a regional stormwater detention facility on New Dunbar Road. The work shall include 29,000 CY of excavation and hauling, installation of storm drainage piping, 10’ diameter outlet control structure and associated piping, entrance road and fencing, erosion and sedimentation control, asphalt removal and replacement, and other miscellaneous related work.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents