Similar Projects
Runway Precision Approach Path Indicator - 49015 - City of Fullerton
Renovation, Infrastructure, Alteration
Conception
$250,000 est. value
Fullerton, CA 92833

Gisler Avenue Landscape Improvements - City of Costa Mesa
Infrastructure, Alteration
Conception
$350,000 est. value
Costa Mesa, CA 92626

AutoZone #3001 / Anaheim
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Anaheim, CA 92801

Center Greens - City of Anaheim
Infrastructure
Design
$3,520,000 CJ est. value
Anaheim, CA 92805

Well 32 Rehabilitation Re-Bid
Infrastructure
Bidding
$12,266,500 CJ est. value
Santa Ana, CA 92706

El Toro High School Restroom and Shower Alterations at Buildings F and N
Renovation
Bidding
$650,000 CJ est. value
Lake Forest, CA 92630

Scott Rd, Pittman Lane, And Barton Banks Rd Street Improvements
Alteration
Post-Bid
Irvine, CA 92602

Installation of OFCI Shade Structures at Crescent Elementary School
Renovation, Alteration
Post-Bid
Orange, CA

Design, DSA Approval and Construction of a Modular Auxiliary Gymnasium Building at Beckman High School
New Construction - 8,580 SF
Results
Irvine, Tustin, CA 92780

Transit Asset Management Plan Update
Alteration
Results
$175,000 est. value
CA

San Juan Hills High School Turf Replacement Project
Infrastructure
Construction
$668,535 CJ est. value
San Juan Capistrano, CA 92675

Junior Lifeguards Building - Parking Lot Improvement - City of Newport Beach
Infrastructure
Construction
$450,000 CJ est. value
Newport Beach, CA 92663

Domingues at McVay Subdivision
New Construction, Infrastructure
Pending Verification
Huntington Beach, CA 92647

Fire Station No. 4 Replacement - City of Laguna Beach
Demolition, New Construction, Infrastructure - 9,975 SF
Pending Verification
$6,100,000 CJ est. value
Laguna Beach, CA 92651

Adams Avenue Bicycle Facility - Fairview Road to Harbor Boulevard - City of Costa Mesa
Infrastructure
Conception
$1,500,000 est. value
Costa Mesa, CA 92627

Last Updated 12/21/2022 03:04 AM
Project Title

Santa Ana Unified School District (SAUSD) - Valley High School Theater Renovation - Rebid

Physical Address View project details and contacts
City, State (County) Santa Ana, CA 92704   (Orange County)
Category(s) Education, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development, Theaters/Auditoriums
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Selective demolition and construction necessary for the Valley High School Theater Renovation, DSA A#04-119994, including associated civil, architectural, structural, plumbing, mechanical and/or electrical work as indicated in the Drawings and Specifications. Generally, these categories of work involve new finishes, adaptive re-use and modification of certain selected areas, new cabinetry, handicap accessibility retrofits, re-roofing, and adding HVAC to instructional areas, library and administrative areas and pertain to changing and expanding selected infrastructure utilities, and extensive modifications. The modifications include the following: 1.2.1.1. Existing building #11 & electrical out-building - complete demolition per plan 1.2.1.2. Existing building #12 theater strategic demolition, renovation, & addition per plan 1.2.1.3. Selective / strategic demolition of existing building components for new work 1.2.1.4. Seismic upgrades per design criteria established in approved DSA # 04-119997 reh 1.2.1.5. Renovation of, and addition to, existing construction to remain 1.2.1.6. Site work 1.2.1.7. Demolition of existing site work per plan 1.2.1.8. CIP concrete south stair / lobby entry platform 1.2.1.9. CIP concrete east and west lobby exit door landings 1.2.1.10. CIP concrete north exit door landings and stairs 1.2.1.11. Landscape areas at west, south, and east 1.2.1.12. Northern paved areas and low walls surrounding building #11 1.2.1.13. Construction of new site work per plan, including: new cip concrete south lobby elevated plaza, stairs, and planters, new north commons / event plaza w/ cip concrete walls, ramps, stairs, paving, and turf / landscape 1.2.1.14. Fire line expansion w/ new hydrants / fdc / piv Bid Package Description License Est Scope Value BP 05 Finish Carpentry & Casework C-6 $ 57,000 BP 13 Wood Flooring C15 $ 64,000 BP 14 Acoustical Ceiling & Treatment C-2 $ 250,000 BP 16 Rigging & Stage Equipment D34 $ 325,000 BP 20 Electrical & Low Voltage C10 $ 3,745,000 Contract Time: 18 Months Allowance: Reference Section 01 21 00 Liquidated Damages: Reference Section 00 52 13 The Project is subject to the Community Workforce Agreement for Construction, Repair, Upgrade, Renovation, Modernization, Expansion, Rehabilitation and Improvement Work Projects dated June 27, 2017 entered into between the District and various labor unions (the CWA). The successful bidder and its subcontractors will be required by the District to be bound by the terms of the CWA section 00 73 49. Prequalification Required: Yes All prequalification questionnaires will be received until March 11, 2022. Any contractor that has prequalified on a District project within the past twelve (12) months may be able to satisfy the prequalification requirements for this project. To become prequalified, applications must be submitted to www.PQBids.com/SAUSD. All questions regarding the Contract Documents are to be directed in writing to Steve Fuentes, Project Manager Tilden-Coil Constructors & copy the District. All pre-bid request for information/clarification questions will be received until 4:00 PM on July 8, 2022. Questions or inquiries can be sent via e-mail to sfuentes@tilden-coil.com & copy construction@sausd.us To Download documents, please contact Tilden-Coil Constructors, Inc., Melanie Lopez, Preconstruction Coordinator mlopez@tilden-coil.com or by calling (951) 684-5901 to be added as a plan holder. Public Access is also granted through the Contractors Tab of the Tilden-Coil website. Please visit: www.tilden-coil.com To Purchase electronic or paper bid documents by following these directions: Send email request to planwell@crispimg.com, reference the Project in the email title, or call helpdesk at (866) 522-8475 and ask for the Planwell Department. Bid Results BC 05 - Finish Carpentry & Casework (C6) - K & Z Cabinet Co., Inc - $62710 BC 13 - Wood Flooring (C15) - McWil Sports Surfaces, Inc - $80660 BC 14 - Acoustical Ceiling & Treatment (C2) - Elljay Acoustics, Inc. - $435647 BC 16 - Rigging & Stage Equipment (D34) - Janson Industries - $943340 BC 20 - Electrical & Low Voltage (C10) - Giant Services, Inc - $4673000

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Projection Screens, Projectors, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating, Fixed Audience Seating.
Division 13 - Special Construction, Sound, Vibration, and Seismic Control.
Division 21 - Fire Suppression, Fire Suppression Systems Insulation, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Theatrical Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents