Similar Projects
Home2Suites and Hilton Garden Inn / Edwardsville
New Construction, Infrastructure
Conception
$45,000,000 CJ est. value
Edwardsville, IL 62025

Smith Lake Drainage Improvements - City of Wood River
Infrastructure
Conception
$1,900,000 CJ est. value
Wood River, IL 62095

Installation of a Second Water Meeting from Bethalto Water to Moreland Road
Infrastructure
Design
$1,750,000 CJ est. value
Bethalto, IL 62010

2022 Microsurfacing Project - Pavement Markings
Infrastructure
Design
$200,000 CJ est. value
Godfrey, IL 62035

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Wood River Recreation Center
New Construction, Infrastructure
Post-Bid
$7,500,000 CJ est. value
Wood River, IL 62095

West Dunn Street Improvements
Infrastructure
Results
Edwardsville, IL 62025

2021 MFT Pavement Patching and Crack Sealing
Infrastructure
Results
$550,000 to $600,000 est. value
Edwardsville, IL

Starbucks / Collinsville
New Construction, Infrastructure - 2,226 SF
Construction
$400,000 CJ est. value
Collinsville, IL 62234

Starbucks / Collinsville
New Construction, Infrastructure - 2,226 SF
Construction
$400,000 CJ est. value
Collinsville, IL 62234

Chick-fil-A / Glen Carbon
New Construction, Infrastructure - 5,000 SF
Pending Verification
$1,000,000 CJ est. value
Glen Carbon, IL 62034

Chick-fil-A / Glen Carbon
New Construction, Infrastructure - 5,000 SF
Pending Verification
$1,000,000 CJ est. value
Glen Carbon, IL 62034

Water Meters / Wood River
Infrastructure
Conception
$853,058 CJ est. value
Wood River, IL 62095

Godfrey Campus Water Service Check Valve Improvement
Infrastructure
Design
$400,000 CJ est. value
Godfrey, IL 62035

Mowing Services For Various City And County Lots
Term Contract, Alteration
Post-Bid
Alton, IL 62002

Last Updated 07/10/2023 10:10 AM
Project Title

Full Depth Hot-mix Asphalt Shoulders

Physical Address View project details and contacts
City, State (County) Alhambra, IL 62001   (Madison County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $4,500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

City/County - Madison The Project Consists of the Removal of the Existing Surface and Replacement With 2" of Hot-mix Asphalt, Portland Cement Concrete Patches, Full Depth Hot-mix Asphalt Shoulders, Striping and Other Appurtenant Work. Earth Excavation - 5,301 Cu Yd Bituminous Materials (Tack Coat) - 44,922 Pound Longitudinal Joint Sealant - 81,913 Foot Hma Surface Course, Il-9.5, Mix "C", N70 - 8,305 Ton Incidental Hma Surfacing - 212 Ton Hma Surface Removal, 2" - 76,044 Sq Yd Class C Patches, Type I, 12 Inch - 5 Sq Yd Class C Patches, Type Ii, 12 Inch - 6 Sq Yd Class C Patches, Type Iii, 12 Inch - 23 Sq Yd Class C Patches, Type Iv, 12 Inch - 1,188 Sq Yd Hma Shoulders, 8" - 23,779 Sq Yd Thermoplastic Pavement Marking - Line 4" - 85,618 Foot Raised Reflective Pavement Markers - 346 Eac Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Full Depth Hot-mix Asphalt Shoulders - 23-00118-04-RS

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents