Similar Projects
Bridges, General (All Classes)
Infrastructure
Bidding
$5,000,000 CJ est. value
Weeping Water, NE 68463

Bridges, General (All Classes)
Infrastructure
Bidding
$5,000,000 CJ est. value
Weeping Water, NE 68463

Parkview Avenue / Wenzel Circle Mill and Overlay Improvements
Infrastructure
Post-Bid
$200,000 est. value
Eagle, NE

New Wastewater Treatment Plant - Contract 1 Site Pre-Grading
Infrastructure
Post-Bid
$260,000 est. value
Plattsmouth, NE

Vireo Parkway Paving Improvements
Infrastructure
Results
$840,000 est. value
Plattsmouth, NE

Fourmile Industrial Park Water Main Extension
Infrastructure
Results
$233,004 CJ est. value
Plattsmouth, NE 68048

SID5 Bay Hills Public Parking Lot
Infrastructure
Construction
$116,592 CJ est. value
Plattsmouth, NE 68048

SID5 Bay Hills Public Parking Lot
Infrastructure
Construction
$116,592 CJ est. value
Plattsmouth, NE 68048

Mopac Trail Wood Box Culvert Replacement - 2023
Infrastructure
Bidding
$400,000 CJ est. value
Eagle, NE 68347

2022 PC Concrete Street Repair Project
Infrastructure
Post-Bid
$400,000 CJ est. value
Plattsmouth, NE 68048

Sanitary Sewer Rehabilitation - Lincoln Avenue Project
Infrastructure
Results
$683,460 CJ est. value
Plattsmouth, NE 68048

2022 EMS Building
New Construction, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Weeping Water, NE 68463

Webster Boulevard Right Turn Lane at 1st Avenue
Infrastructure
Post-Bid
$200,000 CJ est. value
Plattsmouth, NE 68048

Weeping Water Southeast
New Construction, Infrastructure
Post-Bid
$690,000 CJ est. value
Weeping Water, NE 68463

Lake Wa-Con-Da 2023 Chip Seal, Sanitary and Improvement District No. 1 of Cass County
Infrastructure
Post-Bid
$238,290 CJ est. value
Plattsmouth, NE 68048

Last Updated 08/21/2023 08:11 AM
Project Title

New Wastewater Treatment Plant - Contract 3 Raw Wastewater Force Mains, City of Plattsmouth, Nebraska

Physical Address View project details and contacts
City, State (County) Plattsmouth, NE 68048   (Cass County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sewage Treatment Plant, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $17,581,944 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 6, 2023, the project has not been awarded. A timeline for award has not been confirmed. The extent of the project is as follows: The project generally includes the installation of approximately 21,000 LF of nominal inside diameter 24-inch and 12-inch trenched or trenchless sanitary sewer force main, 2,270 LF of storm sewer, 1,685 LF of 8-inch and 6-inch water main, water services, 17,750 SY of PCC mainline paving, 3,000 SY of sidewalk or multi-use trail removal and/or installation, 1,410 SY of PCC driveway installation, 15 acres of seeding, 5,250 SF of block segmental retaining wall installation, erosion control, and other associated work. The Contractor's bid bond, certified check, or cashier's check shall be in an amount of 5% of the Contractor's bid amount made payable to the Treasurer of the City of Plattsmouth, Nebraska. The certified or cashier's check may be cashed by the Owner, or the bid bond forfeited to the Owner as liquidated damages in the event the successful bidder fails to enter into a Contract and file an acceptable bond satisfactory to the Owner assuring the faithful fulfillment of the Contract and maintenance of said improvements, as required by law, within ten days after the acceptance of the Contractor's bid. No Bidder shall withdraw his Bid for at least 30 days after the actual date of the receipt of bids The Owner reserves the right to reject any and all bids, to waive irregularities and informalities therein and to award the Contract in the best interest of the Owner.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents