Similar Projects
Districts 2, 3, and 7 Bridge Preservation (2022) (S)
New Construction, Infrastructure
Results

Murphy Oil #5735/7852 / Monticello
Demolition, New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Monticello, AR 71655

HWY. 65 - HWY. 1 (S)
Infrastructure
Results

Monticello - Highway 65 (South)
Infrastructure
Results
$400,000 est. value
Tillar, AR

Statewide CLRS Improvements
Infrastructure
Results

UAM 6 Inch Waterline Replacement
Infrastructure
Post-Bid
Monticello, AR

Districts 1, 2 and 6 Bridge Preservation (2021)
New Construction
Results

AECC Louis H Fish 115 kV SW. Station and 115-69 kV Substation Site Improvements
Infrastructure
Post-Bid
$400,000 est. value
Tillar, AR 71670

Co. Rd. 47 - Hwy. 35 (Overlay) (S)
Infrastructure
Results
$4,000,000 est. value
Monticello, AR 71655

High Performance Cold Mix
Infrastructure
Post-Bid

Polymer Resin for Polymer Overlay
Term Contract
Results

Tennis Courts and Parking Lot
Infrastructure
Results
$1,048,700 CJ est. value
Monticello, AR 71655

Tennis Courts and Parking Lot
Infrastructure
Results
$1,048,700 CJ est. value
Monticello, AR 71655

Winchester - Chicot Co. Line (Sel. Secs.)
Infrastructure
Results

Jerome - Mcmillan Corner
Results

Last Updated 08/19/2022 02:03 AM
Project Title

Hwy. 278 - Hwy. 293 (S)

Physical Address View project details and contacts
City, State (County) Monticello, AR 71655   (Drew County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $61,897,828 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Purpose of This Project Is to Construct Approximately 8.252 Miles of Two Lane Roadway With Bridge Structures on Highway 569 in Drew County. This Project Consists of Clearing and Grubbing, Removal and Disposal of Items, Earthwork, Aggregate Base Course, Achm Base, Binder, and Surface Courses, Cold Milling Asphalt Pavement, Achm Patching of Existing Roadway, Approach Slabs and Gutters, Maintenance of Traffic, Concrete Ditch Paving, Minor Draininge Structures, Guardrail, Erosion Control Items, Rumble Strips and Stripes, Construct Two Prestressed Concrete Girder Units (Total Lengths 602.17' and 257.17'), Construct One Triple R.c. Box Culvert (Total Span 30.75'), Pavement Marking, and Misc. Items. Federal Aid Project NCIIP-2221(2) Routes: 569 Sections: 7 County: Drew Length: 8.252 miles in length. This Proposal Contains the Special Provision "establishing Contract Time - Working Day Contract" in Which the Bidder Will Determine the Number of Working Days to Complete the Project. The Number of Trainees Required for This Project Is 10. Questions Pertaining to Projects During the Advertisement Period Should Be Addressed to the Program Management Division at Pmd@ardot.gov. the Deadline to Submit a Question Is the Wednesday Prior to the Scheduled Letting Date. a Question Submitted After the Close of Business on the Wednesday Prior to the Scheduled Letting Date May Not Receive a Response. In Order to Have a Bid Considered, Contractors Must Furnish a Proposal Guaranty Consisting of Either a Bidder's Bond or a Certified or Cashier's Check in the Amount of Five Percent (5%) of the Total Amount Bid. in Order for a Bond to Be Acceptable to the Department, the Company Issuing the Bond Must Be Named in the Department of Treasury Listing of Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies. the Underwriting Limitation of the Bonding Company Shall Be Adhered to. Any Excess (Between the Face Amount of the Bond and the Underwriting Limitation) Shall Be Protected by Reinsurance Provided by an Acceptable Reinsuring Company. These Contracts Are Subject to Normal Prequalification, Licensing and Bonding Requirements, Applicable Labor Laws, Non-discrimination Provisions, Wage Rate Laws and Other Federal Laws Including the Fair Labor Stand The purpose of this project is to place ultrathin bonded wearing course on approximately 17.290 miles of highway 63 in Lawrence and Randolph counties. This project consists of removal and disposal items, aggregate base course, fog seal, ACHM surface course, ultrathin bonded wearing course, cold milling asphalt pavement, ACHM patching of existing roadway, approach gutters, maintenance of traffic, guardrail, rumble stripes, pavement marking, and misc. Items. ARDS Acts of 1938. the Work Hours Act of 1962 and Title Vi of the Civil Rights Act of 1964 Also Apply. The Arkansas Department of Transportation Complies With All Civil Rights Provisions of Federal Statutes and Related Authorities That Prohibited Discrimination in Programs and Activities Receiving Federal Financial assistance. Therefore, the Department Does Not Discriminate on the Basis of Race, Sex, Color, Age, National Origin, Religion, or Disability, in the Admission, Access to and Treatment in Department's Programs and Activities, as Well as the Department's Hiring or Employment Practices. Complaints of Alleged Discrimination and Inquiries Regarding the Department's Nondiscrimination Policies May Be Directed to Joanna P. Mcfadden, Section Head - Eeo/dbe (Ada/504/title Vi Coordinator), P. O. Box 2261, Little Rock, Ar 72203, (501) 569-2298, (Voice/tty 711), or the Following Email Address: Joanna.mcfadden@ardot.gov. The Department Reserves the Right to Reject Any or All Bids and to Waive Any Formalities. ARDOT - Hwy. 278 - Hwy. 293 (S)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents