Similar Projects
Country Club Expansion
Renovation
Conception
Glenview, IL 60025

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Bally's Casino / Chicago
LEED Certification, New Construction, Infrastructure
Design
$1,700,000,000 CJ est. value
Chicago, IL 60654

Water Main Replacement
Design
Elmwood Park, IL

Chicago Department of Transportation Job Order Contract for Flatwork - Site Work
Post-Bid
Chicago, IL

Revise Domestic Water System - Division 01
Post-Bid
Chicago, IL 60612

Berwyn Depot District Utility Improvements
Results
Less than $11,765,090 est. value
Berwyn, IL

Water Main Repair Clamps
Results
Buffalo Grove, IL

Woodfield Village Green Demolition & Shell Package
Renovation, Demolition - 101,267 SF
Construction
Schaumburg, IL 60173

210 N Aberdeen Mixed-Use
New Construction, Infrastructure - 10,700 SF
Construction
$140,000,000 CJ est. value
Chicago, IL 60607

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

Focal Point Campus / Chicago
Demolition, New Construction, Infrastructure
Pending Verification
$700,000,000 CJ est. value
Chicago, IL 60623

Elizabeth Street Life Sciences Lab
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Chicago, IL 60642

Revise Domestic Water System - Division 02
Post-Bid
Chicago, IL 60612

Utilities at Birch Park
Renovation
Results
Hoffman Estates, IL 60169

Last Updated 08/22/2022 12:33 PM
Project Title

2022 Sewer Lining Program - Contract B

Physical Address View project details and contacts
City, State (County) Morton Grove, IL 60053   (Cook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $270,626 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Work included in this Contract shall consist of furnishing all the materials, labor, equipment and incidentals required for sewer lining approximately 5,164 feet of 8" sanitary sewer, and 1006 feet of 15" sanitary sewer; restore approximately 131 service taps and eliminate 3 lateral protrusions and all other incidental work necessary to complete this improvement according to the Contract Documents.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents