Similar Projects
Cameron Park Drive Widening - Palmer Drive to Sudbury - 72143 - El Dorado County
Alteration
Conception
$6,047,000 est. value
Cameron Park, CA 95682

US 50 / Latrobe Road / El Dorado Hills Boulevard Interchange Improvements Phase 2B - 36104001 - El Dorado County
Infrastructure
Conception
$7,620,000 CJ est. value
Placerville, CA 95667

Multifamily Construction
Infrastructure, Renovation
Design
South Lake Tahoe, CA 96150

Multifamily Construction
Infrastructure, Renovation
Design
South Lake Tahoe, CA 96150

RFQ Contractor - Sly Park Intertie Improvements Project
Infrastructure
Bidding
$30,000,000 CJ est. value
Pollock Pines, CA 95726

Pleasant Oak Main Pressure Reducing Station 2 Upgrade - 22019 - El Dorado Irrigation District (EID)
Infrastructure
Bidding
$325,000 CJ est. value
Placerville, CA 95667

Auburn Lake Trails Paving Projects
Infrastructure
Post-Bid
$2,000,000 est. value
Cool, CA 95614

Flume 45 Section 3 Replacement - El Dorado Irrigation District
Infrastructure
Post-Bid
$11,000,000 CJ est. value
Placerville, CA 95667

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

2022 Road Work Project
Infrastructure
Results
$250,000 est. value
CA

Motherlode Forcemain Replacement Program - El Dorado Irrigation District
Renovation, Infrastructure
Construction
$15,000,000 CJ est. value
Placerville, CA 95667

Sugar Pine Village
New Construction, Infrastructure
Construction
$19,600,000 CJ est. value
South Lake Tahoe, CA 96150

Ponte Palermo Phase 2
New Construction, Infrastructure - 115,650 SF
Pending Verification
$23,200,000 CJ est. value
Cameron Park, CA 95682

Ponte Palermo Phase 2
New Construction, Infrastructure - 115,650 SF
Pending Verification
$23,200,000 CJ est. value
Cameron Park, CA 95682

Ice House Road Pavement Rehabilitation - Phase 3 - 36105068 - El Dorado County
Infrastructure
Conception
$2,533,000 CJ est. value
Kyburz, CA 95720

Last Updated 01/03/2024 03:02 AM
Project Title

Ice House Road

Physical Address View project details and contacts
City, State (County) Kyburz, CA 95720   (El Dorado County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $19,797,861 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award Date: Dec 21, 2023 Contract Award Number: 6982AF24C000005 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: YUS3LBSE3WB6 Contractor Awarded Name: MARTIN BROTHERS CONSTRUCTION Contractor Awarded Address: Sacramento, CA 95826 USA Base and All Options Value (Total Contract Value): $19,797,861.00 PROJECT NUMBER: CA FLAP ED CR147(2) PROJECT DETAILS: CA FLAP ED CR 147(2) Ice House Road (a) The clauses at 52.236-2, Differing Conditions, and 52.236-3, Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the where the work will be performed. (b) visits may be arranged during normal duty hours by contacting: No organized will be held.ENT 2201 BLUE GUM AVE MODESTO, CALIFORNIA 95358 and PUBLIC OPENING AND READING WILL BE HELD AT THE YOSEMITE COMMUNITY COLLEGE DISTRICT PURCHASING OFFICE, 2201 BLUE GUM AVE., MODESTO CA, 95358 PROMPTLY Questions must be submitted in writing by e-mail at CFLContracts@dot.gov PROJECT DESCRIPTION: Ice House Road, also designated as County Road 147, is located in El Dorado County, California, and provides recreational access to the world-renowned off-highway vehicle Rubicon Trail, the Crystal Basin Recreation Area within the ENF, the Desolation Wilderness area, Loon Lake, Union Valley Reservoir, and Ice House Reservoir. The route is heavily used by vehicles with trailers hauling boats, horses, off-road vehicles and other recreational vehicles. Within the project limits, the road provides direct access to numerous recreational trails and campgrounds, including the Loon Lake area, and Ice House Resort. OF THE WORK: The proposed action is generally described as a 3R rehabilitation project. The improvements consist of a full-depth reclamation which will pulverize and replace the existing two-lane paved roadway with new 11-foot lanes and 1-foot shoulders along Ice House Road from Peavine Ridge Road to Wentworth Springs. This is consistent with the existing roadway which averages a 24-foot width. Minor drainage improvements will also be completed, including paved ditch and asphalt curb replacements or extensions, culvert cleaning, repairs/adjustments and replacements, the addition of underdrain, ditch reconditioning and regrading, and select areas of riprap lining along ditches. Scaling and cleaning of roadside ditch/catchment areas will occur at several cut slope locations. Schedule A includes 14.95 miles of the described work, Option X includes 2.67 miles of the described work, and Option Y includes replacement of bridge barrier rail on 5 bridges on Ice House Road. The price range of the project work is between $20,000,000 and $30,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. FOR GENERAL INFORMATION: E-mail us at CFLContracts@dot.gov.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents