Project Title | Ice House Road |
Physical Address | View project details and contacts |
City, State (County) | Kyburz, CA 95720 (El Dorado County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Request for Qualifications, Construction start expected January 2024 |
Bids Due | View project details and contacts |
Estimated Value | $19,797,861 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contract Award Date: Dec 21, 2023 Contract Award Number: 6982AF24C000005 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: YUS3LBSE3WB6 Contractor Awarded Name: MARTIN BROTHERS CONSTRUCTION Contractor Awarded Address: Sacramento, CA 95826 USA Base and All Options Value (Total Contract Value): $19,797,861.00 PROJECT NUMBER: CA FLAP ED CR147(2) PROJECT DETAILS: CA FLAP ED CR 147(2) Ice House Road (a) The clauses at 52.236-2, Differing Conditions, and 52.236-3, Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the where the work will be performed. (b) visits may be arranged during normal duty hours by contacting: No organized will be held.ENT 2201 BLUE GUM AVE MODESTO, CALIFORNIA 95358 and PUBLIC OPENING AND READING WILL BE HELD AT THE YOSEMITE COMMUNITY COLLEGE DISTRICT PURCHASING OFFICE, 2201 BLUE GUM AVE., MODESTO CA, 95358 PROMPTLY Questions must be submitted in writing by e-mail at CFLContracts@dot.gov PROJECT DESCRIPTION: Ice House Road, also designated as County Road 147, is located in El Dorado County, California, and provides recreational access to the world-renowned off-highway vehicle Rubicon Trail, the Crystal Basin Recreation Area within the ENF, the Desolation Wilderness area, Loon Lake, Union Valley Reservoir, and Ice House Reservoir. The route is heavily used by vehicles with trailers hauling boats, horses, off-road vehicles and other recreational vehicles. Within the project limits, the road provides direct access to numerous recreational trails and campgrounds, including the Loon Lake area, and Ice House Resort. OF THE WORK: The proposed action is generally described as a 3R rehabilitation project. The improvements consist of a full-depth reclamation which will pulverize and replace the existing two-lane paved roadway with new 11-foot lanes and 1-foot shoulders along Ice House Road from Peavine Ridge Road to Wentworth Springs. This is consistent with the existing roadway which averages a 24-foot width. Minor drainage improvements will also be completed, including paved ditch and asphalt curb replacements or extensions, culvert cleaning, repairs/adjustments and replacements, the addition of underdrain, ditch reconditioning and regrading, and select areas of riprap lining along ditches. Scaling and cleaning of roadside ditch/catchment areas will occur at several cut slope locations. Schedule A includes 14.95 miles of the described work, Option X includes 2.67 miles of the described work, and Option Y includes replacement of bridge barrier rail on 5 bridges on Ice House Road. The price range of the project work is between $20,000,000 and $30,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. FOR GENERAL INFORMATION: E-mail us at CFLContracts@dot.gov. |
||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |