Similar Projects
Trade Contractor Prequalification New Fuller Middle School
Post-Bid
Less than $77,935,429 est. value
Framingham, MA 01702

Electric Utility Services for Various Locations
Post-Bid
Marianna, Tallahassee, FL - Jesup, GA - Manchester, Pine Knot, KY - Ayer, MA - Guaynabo, PR - Bennettsville, SC

Underground Utilities
Results
$1,000,000 to $5,000,000 est. value
Buzzards Bay, MA 02542

BPA-Electrical Distribution Maintenance
Results
Bourne, Buzzards Bay, MA 02542

Wastewater Treatment Facility Improvements Contract No.1 Building Demolition and Site Electrical Upgrade - General Bid
Demolition
Construction
Less than $16,000,000 est. value
Fall River, MA

Maintenance of Prime Power and Emergency Generators
Post-Bid
Less than $185,000 est. value
Boston, MA

Crocker Hall Interior Renovations Phase 1 - Filed Sub-Bids
Results
Less than $660,000 est. value
Framingham, MA

Transformer Replacement at West Broadway Development
Post-Bid
Less than $120,719 est. value
Boston, MA 02111

Removal, Repair and Installation of One Emergency Generator for the Hayes Pump Station
Results
Less than $20,000 est. value
Boston, MA

Biennial Bid for Meters
Term Contract
Post-Bid
South Hadley, MA

Switchboard - Low Voltage
Results
Boston, MA

Biennial Bid for Transformers
Term Contract
Post-Bid
South Hadley, MA

Bourne High School Partial Roof Replacement - Filed Sub Bid
Results
Less than $1,200,000 est. value
Bourne, MA 02532

Annual Bid for Wire and Cable
Term Contract
Post-Bid
South Hadley, MA

Furnishing a New Headworks Complete Plant for Normal Wastewater and Septage Flow - Filed Sub-Bids
Results
Less than $900,000 est. value
Tisbury, MA 02568

Reported 11/06/2019 12:00 AM
Project Title

EV Charging Stations

Physical Address View project details and contacts
City, State (County) Greenfield, MA 01301   (Franklin County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,200,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

In an effort to support the adoption of Electric Vehicles and thereby reduce greenhouse gas emissions and improve air quality, MassDOT-Highway is seeking to install Level-II and Level-III Electric Vehicle (“EV”) Charging Stations at various MassDOT-Highway facilities. These facilities include: Park & Rides, Service Plazas and Tourist Information Centers. Selected vendor will be required to: supply, deliver, install/connect and commission EV charging stations at various locations in Massachusetts. Locations are in Eversource territories. Most locations are in Eastern Massachusetts with the exception of a known location in Greenfield, MA.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents