Similar Projects
River Trail Expansion - City of Grand Junction
Infrastructure
Conception
$1,700,000 CJ est. value
Grand Junction, CO 81501

River Trail Expansion - City of Grand Junction
Infrastructure
Conception
$1,700,000 CJ est. value
Grand Junction, CO 81501

Copper Creek Apartment Community
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Fruita, CO 81521

RFP D/B - Design/Build Dos Rios Splash Park Project
Infrastructure - 23,000 SF
Bidding
$500,000 CJ est. value
Grand Junction, CO 81501

24 and G Road Improvements Phase II Project
Infrastructure
Bidding
$300,000 CJ est. value
Grand Junction, CO 81505

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Y--GJFO - 18 Road - Phase 2
Results
Fruita, CO

ML 47 Improvement Project
Construction
$730,000 est. value
Clifton, CO 81520

The Junction Apartments / Old City Market Redevelopment
Demolition, New Construction, Infrastructure - 200,980 SF
Construction
$60,000,000 CJ est. value
Grand Junction, CO 81501

Two Rivers Convention and Events Center Hotel
Addition, New Construction, Build-out, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Grand Junction, CO 81501

West Junction Metropolitan District / Centennial Commercial Park
New Construction, Infrastructure - 715,000 SF
Pending Verification
$100,000,000 CJ est. value
Grand Junction, CO 81501

Riverfront Trail Widening at Broadway and Colorado River (Parkland) - City of Grand Junction
Infrastructure
Conception
$400,000 CJ est. value
Grand Junction, CO 81501

North Mulberry Street Improvements
Infrastructure
Bidding
$6,000,000 CJ est. value
Fruita, CO 81521

Last Updated 11/30/2022 10:48 AM
Project Title

Gateway Collection System Project

Physical Address View project details and contacts
City, State (County) Gateway, CO 81522   (Mesa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project is located in Gateway, CO on the Gateway Canyon Resort's property. The project must be completed during the resort's winter closure between Thanksgiving and Christmas. The project involves the removal and replacement of 120' of 8" PVC Sanitary pipe, the removal and replacement of 14' of 6" PVC Sanitary pipe, installation of a new cast-in-place manholes at the intersection of the 8" & 6" lines, the plugging of an existing abandoned 8" line, and the removal and replacement of minor concrete sidewalk/edging features. There is no pre-bid conference for this project. The Contract will be awarded to the lowest qualified bidder, as determined by the statement of qualifications and the bid, which is deemed to be in the best interest of the County. The County reserves the right to accept the bid or any portion of the bid by a competent bidder that will result in the lowest cost to the County. The County reserves the right to accept or reject any portion or all bids without disclosing the reason therefore. BIDDER shall submit documentation of pre-qualification meeting the requirements included in the project specifications or as follows: For transportation projects, BIDDER shall submit documentation showing they are Colorado Department of Transportation (CDOT) pre-qualified in the Discipline of General Construction work (CDOT Work Code #01). Such pre-qualification shall be in a dollar amount equal to or exceeding the dollar value of the submitted bid. Documentation of pre-qualification will be required to be submitted with the bid. Bids from BIDDERS that do not meet the pre-qualifications requirements MAY BE CONSIDERED A NON- RESPONSIVE BID. A Certified Check or Bank Draft on a responsible bank, or a satisfactory Bid Bond executed by the bidder and a recognized Colorado Licensed Surety Company payable to Mesa County, in an amount equal to five percent (5%) of the total bid, shall be submitted with each bid as security that the bidder to whom the contract may be awarded will enter into a contract in accordance with this notice, and give bond as hereinafter provided. No bids may be withdrawn after the opening of bids, without consent of Mesa County, for a period of sixty (60) days after the scheduled time of opening of bids. The successful bidder or bidders will be required to furnish satisfactory performance bonds equal to the full amount of each bid or bid. All bids must be submitted in writing on the forms provided, and must be signed by the bidder or his duly authorized agent.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents