Project Title | Z2da--542-20-101 | D/B Renovate Building 40 |
Physical Address | View project details and contacts |
City, State (County) | Coatesville, PA 19320 (Chester County) |
Category(s) | Medical |
Sub-Category(s) | Hospital |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $250,000 to $500,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide all inspection, design, supervision, labor, transportation, materials, tools and equipment, and design-build services necessary for design and construction of a project renovation of Project No. 542-20-101, Renovate Building 40 Design-Build. All labor, tools, supplies, transportation, and equipment associated with the replacement of warranty items shall be provided by the contractor at no additional cost to the Government. SPECIFICS: The scope of this project is to hire a Design/Build team that will provide architectural design, tools, labor, material, and supervision, to renovate building 40. Evaluation of existing conditions. Free and clear access to all work area. Site analysis and design charrettes as required. Restore condition of disturbed grasses/vegetation. The scope of work includes but is not limited to the following: Abate Lead Paint in the Building: Removal of lead-based paint in its entirety. Removal of mold in its entirety. All work will be completed in strict accordance with the project specification and EPA, OSHA, Federal, State and PA Department of the Environment regulation. Proper Disposal of lead-based paint. Building Repairs Replace/repair building structures such as floor joists, sub floor, and floor. Insulate walls and roof. Replace/repair building structures such as roof trusses. Relocate basement access to exterior of building. Exterior Repairs: Remove existing roof and replace with standing seamless metal roof. Replace/repair damaged soffit on exterior of building. Replace/repair gutters and downspouts. Repair any block foundation issues. Repair tuck pointing as needed. Mechanical: Demolish existing water line and cap. Demolish and dispose of existing electric water heater. Demolish existing PVC drain line from sink and cap. Install government furnished gas fired heater. Provide and install AC/heat pump. Electrical: Demolish and provide new conduit in its entirety. Provide and install new electrical circuit. Provide fire alarm and tie into main system. Provide and install fiber optic cable. Other considerations: Subsurface/geological evaluations as required. Implementing value-engineering decisions to meet required construction budget. Involvement of a certified industrial hygienist (CIH) to incorporate the necessary guidance in the construction documents as applicable. Providing submittals and final documents as indicated below. PHASING: Construction must allow for continuance of all hospital operations and services provided and coordinate with adjoining projects. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |