Similar Projects
Wastewater Treatment Plant - Village of Marcellus
Renovation
Conception
$4,400,000 est. value
Marcellus, NY

Blind Brook Waste Water Treatment Plant
Renovation
Conception
$3,500,000 CJ est. value
White Plains, NY 10601

Brookview Village - Expansion Phase III
Infrastructure
Design
$500,000 to $1,000,000 est. value
Greenfield Center, NY 12833

Gasport Sewer District 1 Wastewater Disinfection - Town Of Royalton
Renovation, Infrastructure
Design
$650,000 CJ est. value
New York, NY 10036

Onsite Wastewater Treatment Systems
Term Contract
Bidding
NY

Sturgeon Point Water Treatment Plant Washwater Tank Replacement
Infrastructure
Bidding
$700,000 CJ est. value
Derby, NY 14047

Wastewater Treatment Facility Instrumentation and Control Maintenance
Term Contract
Post-Bid
Huntington, NY

Wastewater Treatment Plant Improvements
Renovation
Post-Bid
Clyde, NY 14433

Wastewater Treatment Facility Improvements
Renovation
Results
Corning, NY

Village of Florida RBC #4 Rebuild Project
Renovation
Results
Florida, NY 10921

WPCP Secondary Treatment Upgrade
Construction
$60,650,000 to $69,500,000 est. value
Utica, NY 13502

Honeoye Lake Wastewater Treatment Plant Improvements
Renovation
Construction
Honeoye, NY 14471

Rogers Multifamily Residential
New Construction
Pending Verification
Westhampton Beach, NY 11978

Indian Hills Water System
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Lewisboro, NY 10536

Water Resource Recovery SPK41
Infrastructure
Conception
$5,300,000 CJ est. value
White Plains, NY 10601

Last Updated 12/30/2022 08:20 AM
Project Title

WWTP Boiler Burner and Control System Replacement Project

Physical Address View project details and contacts
City, State (County) Watertown, NY 13601   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $67,892 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Sealed bids will be received by the City of Watertown, Purchasing Department for the following, furnish complete to specifications: WWTP Boiler Burner and Control System Replacement Project. The award of this bid is subject to appropriation of funds necessary by the City of Watertown. The City reserves the right to reject any or all bids, deemed not to be in the best interest of the City, at the sole discretion of the City of Watertown. Further information is available within the City of Watertown, Purchasing Department. Please contact Tina Bartlett-Bearup at (315) 785-7749. The City of Watertown, N.Y is an equal opportunity employer The project site is located on WT Field Dr. consisting of replacing the boiler control system in the new digester building. The successful contractor will be required to provide all labor, materials, machinery, tools, equipment, and other means of construction necessary and incidental to the completion of the work shown on the plans and described in the specifications. This is to be a lump sum bid. 2. Removal and disposal of the existing burner and control system as directed by the City Engineer, and the WWTP manager offices. 3. Supply and install one (1) Power Flame C3-GG-20HTD Natural Gas burner with Autoflame Mini MK8 Combustion Control system. Contractor is responsible for all system disconnects, parts installation, system reconnects, system startups, and any testing required. 4. The burner features are to be as follow: - 1 - 1.5 HP 3 PH Blower Motor - 1 - Manual Pot. With Manual/Auto switch - 1 - Modulating Gas butterfly metering valve - 1 - Gas pilot with 6 KV ignition transformer - 1 - Prepurge: Proven open damper prepurge sequence - 1 - Fixed Premix tube - 1 - Gas train: B20-Mod-UL-M -1 - 2" Ball valve leak test cock -1 - LPG-A 2-14 Tn. Low Pressure Switch - 1 - 2" Motorized valve body/actuator W/ Proof of closure - 1 - HGP-A 2-16 In. Manual reset high gas pressure switch - 1 - 2" RV-91 Main gas pressure regulator -1 - 2" Ball Valve Main Gas shutoff cock - 1 - Protonode in the gateway for monitoring via the BACNET to switch fuels remotely

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents