Similar Projects
Landfill Entrance Improvements, Interior Roadway and Watermain
Infrastructure
Results
Minot, ND

Stanley Pool Replacement - Bid Packages - General, Mechanical, and Electrical Construction
Demolition, New Construction, Infrastructure
Construction
$1,750,961 CJ est. value
Stanley, ND 58784

Water Improvement District 55
Infrastructure
Results
$829,218 CJ est. value
Stanley, ND 58784

Three Affiliated Tribes Elbowoods Memorial Health Center - Dental and Optometry Clinic
LEED Certification, New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
New Town, ND 58763

MHA Nation - Four Bears Segment Four Bears Community Park
New Construction, Infrastructure
Post-Bid
$310,000 CJ est. value
Sanish, ND 58763

Aux Sable Midstream Storage Building
New Construction, Infrastructure - 1,200 SF
Pending Verification
$600,000 CJ est. value
Palermo, ND 58769

Structure Replacement - Bridge No. 31-106-25.0
Infrastructure
Post-Bid
$310,000 CJ est. value
Ross, ND 58776

Woman Goes Out Lift Station Renovation
Renovation, Infrastructure
Post-Bid
$300,000 CJ est. value
Charlson, ND 58763

RFP D/B - Design Build Services on FBHA's Community Revitalization Project
Demolition, New Construction, Build-out, Renovation, Infrastructure
Post-Bid
$5,000,000 CJ est. value
New Town, ND 58763

Mountrail County Route 6 Reconstruction
Infrastructure
Results
$11,306,633 CJ est. value
Stanley, ND 58784

2023 Street Improvements
Infrastructure
Results
$1,005,093 CJ est. value
Parshall, ND 58770

Four Bears Community Park Re-Bid
Infrastructure - 7,521 SF
Post-Bid
$350,000 CJ est. value
New Town, ND 58763

Four Bears Dragswolf Apartments
New Construction, Infrastructure
Post-Bid
New Town, ND 58763

Four Bears Dragswolf Apartments
New Construction, Infrastructure - 26,700 SF
Post-Bid
$8,000,000 CJ est. value
New Town, ND 58763

Frontage Road Hotel
New Construction, Infrastructure - 108,000 SF
Pending Verification
$95,000,000 CJ est. value
New Town, ND 58763

Last Updated 03/24/2023 04:21 AM
Project Title

Construction of Riverview Treatment System Replacement

Physical Address View project details and contacts
City, State (County) New Town, ND 58763   (Mountrail County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

Riverview Estates Treatment System Replacement Construction of Riverview Treatment System Replacement For Existing Sites on the Fort Berthold Reservation Mountrail, North Dakota The Owner will accept bids from qualified contractors for the construction of a replacement wastewater treatment system on the Fort Berthold Reservation, Mountrail, North Dakota. The scope of the work includes furnishing all labor, equipment and materials for the construction of the following: packaged trickling filters, fiberglass duplex lift station, distribution manhole, sewer piping, force main piping, electrical services, standby generator, liquid propane tank, connections to existing manhole, removal of septic tanks, removal of existing treatment system, water line extension, and all other related site work, valves, fittings, and other appurtenances to complete the work as specified. The contract price will not be increased without prior authorization from the Owner via the change order process. Funding for the work is provided by the Federal Government, and payments on the work will be processed by the Owner and the Federal Agency providing the funding. The Contractor shall be required to (a) commence work under this contract within fifteen (15) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than One Hundred Fifty (150) calendar days. Site Directions: Site is located approximately 1/2 mile east of the ND Hwy 23 and 87th AVE NW intersection. 0.3 miles south of ND Hwy 23 Pre-Bid Conference will not be held for this work. Failure to visit the Site and obtain a general feeling for the location of the described work will not relieve the Contractor from the requirement to furnish all materials and perform all jobs necessary to complete the Work in strict compliance with the Contract Documents.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents