Similar Projects
Moore Street Construction - West Travis Street to Park Avenue
Post-Bid
Sherman, TX 75090

Hilre Drive Extension
Post-Bid
$440,000 est. value
Sherman, TX

Southern Region Disaster Recovery Support BPA
Results

Mantua Point Phase 1 Paving and Utilities
Results
$9,681,302 est. value
Van Alstyne, TX 75495

Marshall Drive Paving and Utilities
Post-Bid
Van Alstyne, TX

Widen Non-Freeway
Results
Less than $33,377,299 est. value
TX

Flora Lane Reconstruction
Results
Denison, TX 75020

Concrete Pavement Repair
Results
Less than $1,534,900 est. value
TX

Interchange Improvement
Results
Less than $1,029,182 est. value
TX

Flexible Pavement Structure Repair
Results
Less than $1,806,585 est. value
TX

2020 Street Overlay Program
Results
$441,567 est. value
Denison, TX 75020

Designing Downtown Denison Phase One
Results
Denison, TX 75020

South Jordan and South Streets Rehabilitation
Results
Whitesboro, TX 76273

Overlay SH 289
Results
Less than $2,650,658 est. value
TX

East Park Avenue Roadway Extension
Results
Sherman, TX 75090

Last Updated 12/27/2019 09:50 PM
Project Title

North Texas Regional Airport

Physical Address View project details and contacts
City, State (County) TX   (Grayson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Prepare an Airport Development Plan update which includes, but is not limited to, information regarding existing and future conditions, proposed facility development to meet existing and future demand, constraints to development, anticipated capital needs, financial considerations, management structure and options, as well as an updated Airport Layout Plan. The Airport Development Plan should be tailored to the individual needs of the airport. 2. Prepare a stand-alone pavement management plan for the airport in accordance with the FAA's advisory circular 150/5380-7B, Airport Pavement Management.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents