Similar Projects
ABMS Maintenance/Logistics Facility, Robins AFB
New Construction - 227,000 SF
Post-Bid
$10,000,000 CJ est. value
Warner Robins, GA

Aircraft Hangar - Door/Roof Repairs
Renovation
Post-Bid
Savannah, GA

Design/Build Hangar
Results
$140,000 est. value
Camilla, GA 31730

Hangars D & E Expansion
Results
$425,000 to $525,000 est. value
Adel, GA 31620

PN 88410 Construct Aircraft Maintenance Hangar
- 717,000 SF
Construction
$25,000,000 to $100,000,000 est. value
Savannah, GA

PDK Atlantic Aviation Hangars L & K
New Construction - 102,800 SF
Construction
$10,000,000 CJ est. value
Atlanta, GA 30341

PUJ-South T-Hangar Development Project
New Construction
Post-Bid
Dallas, GA 30157

General Aviation Terminal and Hangar Complex Development
New Construction - 52,500 SF
Results
Albany, GA 31701

Airport T-Hangars
New Construction
Results
GA

Statesboro-Bulloch County Airport New Corporate Hangar
New Construction
Results
Statesboro, GA 30461

T-Hangar Area - Hangar Building Construction
New Construction
Results
Woodbury, GA 30293

Corporate Airport Hangar
New Construction
Results
$296,462 est. value
Camilla, GA 31730

Repair / Renovate Aircraft Corrosion Control Facility - Building 59
Renovation - 112,500 SF
Results
Warner Robins, GA

Maintenance Hangar for Cordele Airport
Renovation
Results
Cordele, GA 31015

Hangar N1 Ramp & Taxilane
Renovation
Results
Augusta, GA 30903

Last Updated 06/01/2022 05:58 AM
Project Title

Hangar 1 Renovation

Physical Address View project details and contacts
City, State (County) Dallas, GA 30132   (Paulding County)
Category(s) Transportation
Sub-Category(s) Aircraft Hangar
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Corporate Hangar 1 located at the Paulding Northwest Atlanta Airport and is generally described as follows: 1.Installation of fire rated walls with curb base to create three separate spaces in the hangar. 2.Structural and other modifications to accept new walls, doors and exhaust fan 3.Installation and modification of electrical circuits, receptacles and lighting. 4.Modifications of the fire sprinklers. 5.Installation of an exhaust fan and relocation of an overhead fan. 6.Installation of 35’x20’ hangar stack door and entry door. 7.Painting, insulation, concrete etching, fire and fuel resistant caulking, other work as specified

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents