Similar Projects
Bituminous Seal Coat Planned Work
Infrastructure
Bidding

Downtown Riverfront Improvements Phase 2
Infrastructure
Bidding
Fergus Falls, MN

2021 Crack Sealing
Post-Bid
MN

DNR1 Pelican Lake East PWA Parking Lot Repair
Post-Bid
MN

Westwind 4th Addition Street & Utility Improvements
Results
MN

Westwind 4th Addition Street & Utility Improvements
Results
MN

DNR Mystery Cave Cathedral Passage Concrete Trail
Infrastructure
Bidding
$80,000 est. value
Erhard, MN 56534

Sidewalk Replacement at the Dent Community Center
Post-Bid
Dent, MN 56528

Riverfront Improvements Phase 1
Results
Fergus Falls, MN

McMenemy Street Improvement
Infrastructure
Bidding
Maplewood, MN

2nd Street Utility and Surface Improvements
Post-Bid
Henning, MN 56551

CSAH 35 Full Depth Reclaim, Wear Course, Shouldering
Results
$693,472 est. value
MN

2022 Utility and Surface Improvements
Infrastructure
Bidding
$240,000 est. value
Henning, MN 56551

North Smoky Hills Graveling
Renovation
Post-Bid

County-wide Pavement Markings
Results
MN

Last Updated 04/13/2022 11:52 AM
Project Title

CSAH 5 Resurfacing

Physical Address View project details and contacts
City, State (County) MN   (Otter Tail County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Grading, FDR, Wear Courses, Concrete Curbs and Gutter and ADA Improvements CSAH 5 from TH 210 to CSAH 16; 5.227 miles Remove Curb & Gutter 2,051 LF Remove Concrete Walk 1,056 SY Remove Aggregate 4,243 CY Full Depth Reclamation 76,364 SY Milled Rumble Strips-Intermittent 16,702 LF Type SP 9.5 Wearing Course Mix (3;C) 8,609 Ton Type SP 12.5 Wearing Course Mix (3;C) 8,447 Ton 4” Concrete Walk 9,513 SF Curb & Gutter Design B618 2,072 LF Common Topsoil Borrow 3,668 CY Seeding 5 Acre 4” Solid Line Multi Comp 37,283 LF 6” Solid Line Multi Comp GR IN (WR) 51,466 LF

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents