Similar Projects
CSAH 32, 33, 67 and CR 106 Construction
Infrastructure
Bidding
MN

2022 Township Paving Improvements
Infrastructure
Bidding
$180,000 est. value
Pillager, MN

North Smoky Hills Graveling
Renovation
Post-Bid

Grading and Paving with Culverts and Storm Sewer
Infrastructure
Post-Bid
Walker, MN

Grading, Full Depth Reclamation, Bituminous Mill and Resurfacing, Revise Signal System and Bridge No. 11X06 and 11X07
Results
MN

Grading, Bituminous Surfacing, ADA Improvements
Results
MN

LEECH LAKE BAND OF OJIBWE
Infrastructure
Construction
Cass Lake, MN

2022 Street and Wastewater Improvements
Infrastructure
Bidding
$600,000 to $650,000 est. value
Lake Shore, MN

Cass Lake Bike Trail
Infrastructure
Post-Bid
Cass Lake, MN

Road Maintenance 2021-2022
Term Contract
Results
$100,000 est. value
MN

2022 Resurfacing Project
Infrastructure
Bidding
$310,000 est. value
Cass Lake, MN 56633

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

2021 Gull Lake Trail
Results
$1,700,000 est. value
MN

Lower Cass Frontage Resurfacing Project
Infrastructure
Bidding
$500,000 est. value
Cass Lake, MN 56633

CR 139 & CSAH 3 Reclamation, Culvert Replacement & Bituminous Patches
Results
MN

Last Updated 04/08/2022 02:04 PM
Project Title

Road Grading, Chippewa National Forest

Physical Address View project details and contacts
City, State (County) Cass Lake, MN 56633   (Cass County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Furnish equipment, operator, supplies, and materials to blade designated Forest Service roads within the Chippewa National Forest. 2. There will be one (1) to as many as three (3) blading cycles. The intent is to finish all three blading cycles provided weather conditions allow. The first cycle will normally begin around May 1, with the last blading cycle being finished before frozen ground conditions in the fall.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents