Similar Projects
Carlisle Baptist Church
New Construction - 36,000 SF
Conception
Panama City, FL

Alachua County School Board / 143rd St
New Construction, Infrastructure
Conception
$50,000,000 CJ est. value
Gainesville, FL 32606

Northstar Church
Renovation
Design
Panama City Beach, FL

AutoZone #1073 / Lynn Haven
New Construction, Infrastructure - 5,000 SF
Design
$1,500,000 CJ est. value
Lynn Haven, FL 32444

Baker County Transportation Facility Bus Wash Building
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Macclenny, FL 32063

RFP D/B - SR 26 from Oaks Mall to SE 9th Street
Infrastructure
Bidding
$2,439,894 CJ est. value
Gainesville, FL 32607

Oak Hall Lower School Enrichment Center Bid Package
New Construction, Infrastructure - 6,948 SF
Sub-Bidding
$2,400,000 CJ est. value
Gainesville, FL 32607

Northstar Church
Renovation - 24,800 SF
Post-Bid
Panama City, FL

Harvest Worship Center - Phase 1, 2 & 3
New Construction, Infrastructure - 19,686 SF
Post-Bid
$3,000,000 CJ est. value
Panama City, FL 32405

Gore Park Site Work
Renovation, Infrastructure
Results
Callaway, FL 32404

Sitework Contractor Services
Term Contract, Infrastructure
Results
Gainesville, FL

St. Andrews United Methodist Church Hurricane Rebuild
New Construction, Demolition
Construction
$1,500,000 est. value
Panama City, FL 32401

New Bethel Missionary Church
New Construction, Demolition
Construction
Panama City, FL 32401

Sonic at SW Archer Road / Gainesville
New Construction, Infrastructure - 4,920 SF
Pending Verification
$1,000,000 CJ est. value
Gainesville, FL 32608

Park Lane Planned Development Phase IIA
New Construction, Infrastructure
Pending Verification
$66,000,000 CJ est. value
Gainesville, FL 32608

Last Updated 11/23/2022 07:34 PM
Project Title

RCMA Hopewell Campus

Physical Address View project details and contacts
City, State (County) Avon Park, FL 33825   (Highlands County)
Category(s) Education, Heavy and Highway, Religious/Funeral
Sub-Category(s) Pre-School/Daycare, Religious Facility, Site Development
Contracting Method Bids by Invitation
Project Status Accepting Solicitations, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $7,000,000 [brand] Estimate
Plans Available from Architect - 08/22/22
Owner View project details and contacts
Architect View project details and contacts
Description

RCMA (Redlands Christian Migrant Association) is soliciting bids from State of Florida licensed General Contractors for the following project: A Child Care Center and other ancillary buildings for a project called RCMA Hopewell Campus located in Avon Park, Florida. The scope of work includes the construction of a childcare center and ancillary spaces with a gross square footage of approximately 46,000 SF. Construction of 5 New Buildings which include, but are not limited to: Site Work, Landscaping & Irrigation, Concrete, Masonry, Misc. Metals, Structural Steel, Millwork/Casework, Waterproofing, Roofing, Doors / Frames / Hardware, Windows/Storefront/Glazing, Drywall, Stucco, Painting, Flooring, Acoustical Ceiling Tiles, Specialties, Canopies/Awnings, Food Service Equipment, HVAC, Plumbing, Fire Sprinkler, Electric/LV/Lighting, Fire Alarm. The site consists of about 5 acres on an existing facility in Avon Park, Florida. The provisions of the Davis Bacon Act are required for all work. A wage determination will be provided in the bid documents. A Bid Bond and a Performance and Payment Bond for the full amount of the Bid is required.

Details

30,000 SF, 130.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Religious Equipment.
Division 12 - Furnishings, Religious Art, Casework, Specialty Casework, Religious Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents