Similar Projects
Last Updated | 01/03/2024 03:33 AM |
Project Title | RFQ Construction Management at Risk - New Nursing Building, Nicholls State University |
Physical Address | View project details and contacts |
City, State (County) | Thibodaux, LA 70301 (Lafourche County) |
Category(s) | Education, Heavy and Highway, Medical |
Sub-Category(s) | College/University, Medical Office/Outpatient, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Request for Qualifications, Construction start expected July 2024 |
Bids Due | View project details and contacts |
Estimated Value | $15,330,112 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Part A: Pre-construction Services (Design-assist) And Part B: Construction Services Construction of a new, approximately 34,235 s.f. building & associated site development. See Section 7 and Exhibit C for further details. The estimate of the probable construction cost (GMP) for this Project is $16,117,500.00 and the target date for completion is November 24, 2025. This project consists of the design of a new, approximately 34,235 s.f. facility for the Nicholls State University Nursing Program, located in Thibodaux, Louisiana. The new facility will be a free-standing multi-story building adjacent to Ayo Hall (the existing nursing college building), with a new plaza between the two buildings. The plaza will include amenities such as seating, landscaping and possibly exterior art. Displaced parking will be located in the existing Guidry Stadium parking lot adjacent to the proposed site. This new facility will include classrooms, lecture space, office space for faculty and support staff, and space for technical, laboratory and clinical training. See Exhibit C for complete program. The CMAR contractor shall be responsible for all coordination between the Owner, User Agency and the Designer required to integrate and install the following Project elements, which are included in the Project, but not in the CMAR contractor's contract scope : New equipment acquisitions and installation (non-building systems equipment) New non-fixed furniture acquisitions/installation and audio-visual (AV) equipment, if applicable Information Technology hardware (i.e. PCs, servers, etc.) The State reserves the right to accept or reject, in whole or in part, all Proposals submitted and/or cancel the announcement if it is determined to be in the State's best interest |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |