Similar Projects
Pavement Resurfacing District I
Infrastructure
Bidding
$5,272,746 est. value

2021 Municipal Road Reconstruction
Infrastructure
Bidding
Milford, NH

2020 Paving Contract Bid Package
Post-Bid
Manchester, NH

Roadway Preservation on Various Roadways
Post-Bid
Less than $1,227,623 est. value

Pavement Resurfacing in District 5 and 6
Results
Less than $4,742,960 est. value
Allenstown, Amherst, Atkinson, Auburn, Barnstead, Barrington, Bedford, Boscawen, Bow, Brentwood, Brookline, Candia, Canterbury, Chester, Chichester, Concord, Deerfield, Derry, Dover, Dunbarton, Durham, Epsom, Goffstown, Hampstead, Henniker, Hollis, Hooksett, Hopkinton, Hudson, Litchfield, Londonderry, Manchester, Merrimack, Milford, Mont Vernon, Nashua, New Boston, New London, Northfield, Pelham, Pembroke, Pittsfield, Raymond, Salem, Sandown, Sutton, Tilton, Warner, Weare, Webster, Windham, NH 03811

Resufacing Various Tier 2 Roadways in District 2
Results
Less than $2,308,737 est. value

2020 Municipal Road Reconstruction
Post-Bid
Milford, NH

2020 Road Resurfacing
Term Contract
Results
Goffstown, NH

2021 Paving Projects
Post-Bid
Hillsboro, NH 03244

2020 Paving Program Contract (1)
Results
Nashua, NH

Southside Middle School Asphalt Play Area and Parking Improvements
Post-Bid
Manchester, NH

Cold Planing and Resurfacing - On Call Services
Results
Manchester, NH

Reclaiming
Results
Manchester, NH

Chip Sealing
Results
Manchester, NH

Fog Seal Treatments
Results
Manchester, NH

Last Updated 05/10/2021 11:09 AM
Project Title

Baboosic Lake Road and Turkey Hill Road Roundabout Construction Project

Physical Address View project details and contacts
City, State (County) Merrimack, NH   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Roundabout Construction Project is located at the intersection of Baboosic Lake Road and the Turkey Hill Road. The construction will consist of removing the existing ‘Y’ intersection and relocating the 120 foot roundabout westerly to incorporate part of the wooded area within the existing Right of Way. The construction shall include the installation of traffic separating islands at the entrance/exits, along with the drainage, side slopes signage etc. The entrance to Glenwood Lane will be reconstructed to enter as a one way only into Glenwood.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents