Similar Projects
Williamson Creek - Richmond Tributary Rehabilitation
Infrastructure
Conception
Less than $4,200,000 est. value
Austin, TX

Williamson Creek - Richmond Tributary Rehabilitation
Infrastructure
Conception
Less than $4,200,000 est. value
Austin, TX

Marshall Readiness Center Sanitary Sewer
Infrastructure
Bidding
$350,000 est. value
Marshall, TX 75672

Dove Song Unit 1
Infrastructure
Bidding
$100,000 est. value
Kingsbury, TX

Trinity Crossing Phase 6A Utility Improvements
Post-Bid
Mesquite, TX

Trinity Crossing Phase 6A Utility Improvements
Post-Bid
Mesquite, TX

Water Line Replacement Project
Results
Anahuac, TX 77514

Fairmont Street Water and Sanitary Sewer Replacement Project
Results
$1,138,143 est. value
Longview, TX 75604

Water Line Improvements Phase 4 - WA2101 - City of Alvin
Infrastructure
Conception
$2,329,400 est. value
Alvin, TX

Grease Trap Cleaning Services
Infrastructure
Bidding
Huntsville, TX 77340

Water Production Facilities Rehabilitation
Post-Bid
Pearland, TX

Blue Ridge Sanitary Sewer Replacements
Results
Less than $418,000 est. value
Blue Ridge, TX

Lead-Free Brass and Ductile Iron Fittings
Infrastructure
Bidding
Fort Worth, TX

Midtown Reserve Subdivision Phase 107
Post-Bid
College Station, TX

Cargo Dock 9 Stormwater and Wastewater Improvements & Cargo Dock 9 Pavement Improvements
Results
Corpus Christi, TX

Last Updated 07/01/2022 12:53 AM
Project Title

Gruene Wastewater and Inverted Siphon - Odor Control

Physical Address View project details and contacts
City, State (County) New Braunfels, TX 78130   (Comal County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $335,194 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project is anticipated to include some or all of the following items within its scope: (i) construction of a permanent odor control facility and connection to the Gruene Road siphon structure; (ii) installation of piping; (iii) installation of valves; (iv) construction of outdoor chemical facilities; (v) installation of structural and electrical equipment; (vi) installation of instrumentation; (vii) traffic control; (viii) site security; and (ix) all other appurtenances necessary.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents