Similar Projects
Reported | 04/05/2022 12:00 AM |
Project Title | EHRM Infrastructure Upgrades Design |
Physical Address | View project details and contacts |
City, State (County) | Pittsburgh, PA 15215 (Allegheny County) |
Category(s) | Professional Services |
Sub-Category(s) | Architectural, Engineering |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | Less than $18,904,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | SCOPE OF DESIGN The scope of work for this contract shall include but not limited to the design services for Project 646A-22-700, EHRM Infrastructure Upgrades at the VAPHS H. J. Heinz Campus in Pittsburgh, Pennsylvania. The contract will be separated into two parts (1) A/E Part One Services (also known as Design Phase), and (2) A/E Part Two Services (also known as Construction Period Services) to include site visits, field investigation, studies and user interviews to prepare drawings, specifications and cost estimates, and commissioning services for all facets of work and disciplines/trades to facilitate a construction project to upgrade the facility infrastructure to support the new Electronic Health Record Modernization (EHRM) system in accordance with VA OEHRM Site Infrastructure Requirements (provided by VHA). The scope of this project includes but not limited to the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes), communication infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, hazardous material abatement. The lead designer or A-E on staff representing the project in each discipline must be licensed or registered to practice in any one of the United States of America. The A-E is responsible for all services to complete the deliverables listed in the Statement of Work (SOW) (See SOW EHRM Infrastructure Upgrades Pittsburgh Heinz, PA). The deliverables outlined in the SOW are inclusive of the following: Quality Assurance/Quality Control (QA/QC) Plan, Basis of Design (BD) (10%), Schematic Design (SD) (35%), Design Development (DD) (65%), Construction Documents (95%), Final Bid Documents (100%). The deliverables schedule can be found in the SOW. Please note that the 144 calendar-day period of performance for the design completion begins with the issuance of the Notice of Award and that a Notice to Proceed will not be issued for the completion of a design project. The construction period services will be option items that will be exercised after the award of the construction project. The period of performance for construction period services will match the period of performance for the construction project. |
Details | Architectural, Renovation. |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |