Similar Projects
Mille Lacs Band of Ojibwe District III Head Start
New Construction, Infrastructure - 5,557 SF
Bidding
$1,300,000 CJ est. value
Hinckley, MN 55037

City Parking Lot Reconstruction
Infrastructure
Bidding
$300,000 CJ est. value
Cambridge, MN 55008

Webster Educations Center Renovation
Renovation
Sub-Bidding
$8,000,000 CJ est. value
Grove City, MN 56243

South Kawishiwi Pavilion Ramp Construction and Log Repair
Infrastructure, Renovation
Post-Bid
$100,000 CJ est. value
Ely, MN 55731

South Kawishiwi Pavilion Ramp Construction and Log Repair
Infrastructure, Renovation
Post-Bid
$100,000 CJ est. value
Ely, MN 55731

Concrete Pavement Rehabilitation, Bituminous Surfacing
Results
MN

Concrete Rehabilitation, Bituminous Milling
Alteration
Results
MN

SPPS Jie Ming Mandarin Immersion Part 3 BP #3
Renovation
Construction
$3,000,000 CJ est. value
Saint Paul, MN 55116

Jie Ming Mandarin Immersion Addition and Renovation - Part 2 Earthwork, Utilities, Building Demolition
Infrastructure - 20,000 SF
Construction
$1,086,550 CJ est. value
Saint Paul, MN 55116

2023 Bituminous Roadway Improvements Harris Township
Infrastructure
Bidding
$700,000 CJ est. value
Wabana Township, MN 55744

As-Needed Concrete and Masonry Services
Term Contract
Post-Bid
MN

2022 Random Concrete Repairs
Infrastructure, Alteration
Results
Saint Louis Park, MN

Airport Utilities Extension and Grading
Infrastructure
Bidding
$400,000 CJ est. value
Grand Rapids, MN 55744

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

2022 Miscellaneous Concrete Work
Alteration
Results
Faribault, MN

Last Updated 04/14/2023 07:34 AM
Project Title

North Creek Greenway Improvements

Physical Address View project details and contacts
City, State (County) Apple Valley, MN 55124   (Dakota County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,985,579 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project generally consists of supplying certain specified materials, equipment, and labor to perform bituminous removal, common excavation, ADA pedestrian ramps, bituminous trail overlay, storm sewer utilities, amenity nodes, landscaping, pedestrian bridge, and other related activities within the City of Apple Valley. City Project 2021-150 NORTH CREEK GREENWAY GAPS - TRAIL IMPROVEMENTS 4,000 SY MILL BITUMINOUS PAVEMENT 1,500 CY COMMON EXCAVATION 1,200 CY AGGREGATE BASE CL 5 1,850 TON BITUMINOUS PAVING (TRAIL) 1 LUMP SUM PREFABRICATED PEDESTRIAN BRIDGE 650 SY 8" CONCRETE PAVEMENT 6,700 SF CONCRETE WALK 280 LF BOULDER RETAINING WALL 2,100 CY TOPSOIL 80 EACH DECIDUOUS TREES 40 EACH ORNAMENTAL TREES 740 EACH PERENNIALS 250 EACH DECIDUOUS SHRUBS The bid bonds must be payable to the City of Apple Valley in the amount of five percent (5%) of the amount of bid. Any, and all questions bidders may have in connection with this solicitation are to be directed by email only to: Jodie.scheidt@applevalleymn.gov No bidder questions will be addressed after 12:00 pm on Friday, April 7, 2023. The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 60 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 30 days after the date and time set for the Opening of Bids. The successful bidder must be a "responsible contractor.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents