Similar Projects
Florence Roche Elementary School
New Construction - 109,855 SF
Design
$61,500,000 est. value
Groton, MA 01450

Construction of the New Lexington Police Station
New Construction - 32,850 SF
Bidding
$26,500,000 est. value
Lexington, MA 02420

Engineering, Planning and Development
Post-Bid

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Post-Bid
Less than $45,000,000 est. value
Washington, DC

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

Maynard Fire Station - General Bids
New Construction - 19,000 SF
Construction
$11,000,000 est. value
Maynard, MA

922 Massachusetts Avenue Renovation
New Construction, Renovation
Construction
Cambridge, MA 02139

St. Andrews Episcopal Church Solar Canopy
Alteration
Pending Verification
Framingham, MA 01702

Design Services for the Reuse/Renovation of the Brook School Apartment Building A Lower Level
Post-Bid
Weston, MA

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

Green at UTEC
New Construction
Construction
Lowell, MA 01852

Wayland Housing Production Plan
Post-Bid
Wayland, MA

Procurement of Engineering and Design and Construction Phase Services for the Massachusetts Institute of Technology Lincoln Laboratory (MIT Ll) Engineering Prototyping Facility (EPF) at Hanscom Air Force Base (HAFB), Lexington, MA
Results
$100,000,000 to $250,000,000 est. value
Bedford, MA 01731

IDIQ Contract for Architect-Engineer Services for Compliance with Air Emission Regulations, EPCRA Regulations, Greenhouse Gas & All Other Environmental Media Regulations
Post-Bid

Last Updated 07/21/2022 03:04 PM
Project Title

RFP Design - Medford Fire Headquarters

Physical Address View project details and contacts
City, State (County) Medford, MA 02155   (Middlesex County)
Category(s) Government/Public, Heavy and Highway, Professional Services
Sub-Category(s) Architectural, Fire/Police Station, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Design and Construction of a Fire Headquarters Building. This will initially include Feasibility Study and Schematic Design. The City reserves the right to proceed past Feasibility/Schematic with the selected firm. Designer Fee Negotiated Estimated Construction Cost $20 million Time Period for Completed Project To be determined The method of Contractor Selection has not been Determined at this time.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents