Similar Projects
Montgomery County Yard Trim Hauling
Bidding
Derwood, Dickerson, Silver Spring, MD 20842

Statewide Tire Recycling Program
Term Contract
Bidding

Bulk Top Soil
Term Contract
Post-Bid
Gaithersburg, Hyattsville, Silver Spring, Temple Hills, MD 20781

Statewide Recycling Services For MDOT MVA
Term Contract
Post-Bid
Annapolis, Bel Air, Beltsville, Cumberland, Easton, Frederick, Gaithersburg, Glen Burnie, Hagerstown, Largo, Loveville, Salisbury, Waldorf, Westminster, White Oak, MD

Industrial and Technology Education Lumber
Results
Rockville, MD 20850

Refuse and Recycling Collection Services for Various County Facilities
Results
Aspen Hill, Bethesda, Burtonsville, Chevy Chase, Colesville, Kensington, Olney, Potomac, Rockville, Silver Spring, Takoma Park, Wheaton, White Oak, MD 20850

Dumpster Refuse and Recycling Collection and Disposal Services
Post-Bid
Rockville, MD 20850

Snow and Ice Removal Services - Gaithersburg, MD (MD013)
Results
est. value
Gaithersburg, MD 20879

Recycling Collection Services
Post-Bid

Technical Offer for the Pre-Qualification of Contractors for the Relocation/Installation of Relocatable Classrooms
Results
MD

Refuse and Recycling Collection Services
Term Contract
Post-Bid
Chevy Chase, MD 20815

Full-Width Litter Pick-UP (5 Person Crew) at Various Locations in the Gaithersburg
Results
$100,001 to $500,000 est. value
MD

Statewide Electronic Recycling
Term Contract
Post-Bid

Full-Width Litter Pick-Up (5 Person Crew)
Results
$100,000 to $500,000 est. value
MD

8(A) Regional Refuse Collection, Disposal and Recycling Services
Post-Bid
Washington, DC

Reported 07/13/2021 12:00 AM
Project Title

FY22 and FY23 Snow Removal

Physical Address View project details and contacts
City, State (County) Kensington, MD   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. The Contractor shall be responsible for plowing and sanding Town roads, as determined by the Town Manager. The Town has approximately five (5) miles of roadway in its jurisdiction for which it is responsible. 2. Contractor shall provide all necessary equipment and labor to make certain streets are cleared in a timely manner. Contractor shall begin operations upon snow accumulation of a 2-inch depth. Contractor will continue operations until assigned streets are clear and precipitation has ended. 3. The Contractor will apply sand rather than salt as the primary traction base. In areas with steep inclines and at steep intersections, a mixture of salt and sand will be applied. The Contractor will provide barrels of a salt and sand mixture at steep intersections for residents’ use. The contractor must supply the sand and salt required by the contract

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents