Similar Projects
Albar Lift Station - 20970 - City of Lapeer
Infrastructure
Conception
$275,000 CJ est. value
Lapeer, MI 48446

Albar Lift Station - 20970 - City of Lapeer
Infrastructure
Conception
$275,000 CJ est. value
Lapeer, MI 48446

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Pit Cleaning-Bascule Bridges, Multiple Services
Infrastructure
Post-Bid

Various Tree and Brush Removal
Term Contract
Post-Bid
Lapeer, MI 48446

SRF Wastewater System Improvements
Renovation, Infrastructure
Results
$1,400,000 est. value
Columbiaville, MI

Lapeer Lead Service Line Replacements
Infrastructure
Results
$1,136,130 CJ est. value
Lapeer, MI 48446

Center of Innovation - 2022 Bond - Lapeer Community Schools
Renovation, Infrastructure
Pending Verification
$2,323,567 CJ est. value
Lapeer, MI 48446

Lapeer High School - 2022 Bond - Lapeer Community Schools
Addition, Renovation, Infrastructure
Pending Verification
$22,022,240 CJ est. value
Lapeer, MI 48446

Genesee Street Water Main (Millville Road to Harrison Street) - 17150 - City of Lapeer
Infrastructure
Conception
$1,749,925 CJ est. value
Lapeer, MI 48446

Murphy Oil #7092/7845 / Lapeer
Demolition, New Construction, Infrastructure - 1,400 SF
Bidding
$2,000,000 CJ est. value
Lapeer, MI 48446

RFP Engineering - Professional Engineering and Survey Design Services Grade, Base, and Drainage Koylton Township
Infrastructure
Post-Bid
$4,000,000 CJ est. value
Clifford, MI 48727

Cedar Street Sidewalk
Infrastructure
Results
$217,173 CJ est. value
Imlay City, MI 48444

Lynch Elementary - 2022 Bond - Lapeer Community Schools
Renovation, Infrastructure
Pending Verification
$1,386,773 CJ est. value
Lapeer, MI 48446

Last Updated 03/16/2023 09:13 AM
Project Title

Park Street Reconstruction with Water Main Improvements - 18060 - City of Lapeer

Physical Address View project details and contacts
City, State (County) Lapeer, MI 48446   (Lapeer County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $890,800 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruct W. Park Street from N. Saginaw Street to N. Calhoun Street and replace a 6" water main with an 8'' water main, valves and services to the right of way. As of March 16, 2023 , this project is currently in the FY 2022-2028 CIP. Information regarding a design team and the contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents