Similar Projects
Major HVAC Renovation at Vare-Washington Elementary School - Mechanical
Alteration
Bidding
$3,736,178 est. value
Philadelphia, PA 19147

Bronchoscopy Suite - Mechanical Package
Alteration
Bidding
Philadelphia, PA 19140

Installation of a High Efficiency Gas Fired Summer Winter Phased Boiler System
Post-Bid
Penndel, PA 19047

Philadelphia Zoo Animal Hospital - Mechanical Equipment Replacement
Post-Bid
Philadelphia, PA 19104

Midvale Depot HVAC and Roof Replacement- Mechanical Construction
Results
Philadelphia, PA 19144

Annual Boiler/Burner Maintenance and Tuning
Term Contract
Results
Quakertown, PA 18951

Sluice Gates Motorized Valves Betterment at Queen Lane WTP
Alteration
Bidding
$3,000,000 to $4,000,000 est. value
Philadelphia, PA 19129

MATSCC Rainwater Replacement Project
Post-Bid
Philadelphia, PA 19123

Lemon Hill Mansion Rehabilitation - Mechanical Construction
Results
$100,000 to $300,000 est. value
Philadelphia, PA 19130

Major Addition and Renovations at Rhawnhurst Elementary School - Mechanical
Alteration
Bidding
$3,647,342 est. value
Philadelphia, PA 19152

Lower Southampton (BCIU) Boiler Replacement
Post-Bid
Langhorne, PA

Penn Treaty High School Science Lab Renovations - Mechanical Construction
Results
Less than $96,500 est. value
Philadelphia, PA 19125

Philadelphia International Airport - Airport Operations Center (AOC) - Mechanical Construction
Alteration
Post-Bid
$100,000 to $300,000 est. value
Philadelphia, PA 19153

Boiler Repair
Results
Less than $25,000 est. value
Philadelphia, PA

Various MEP Improvements at Philaport Facilities
Alteration
Post-Bid
Philadelphia, PA

Reported 12/08/2021 12:00 AM
Project Title

H245--Boiler Safety Device Testing Philadelphia VAMC

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19104 (Bucks, Philadelphia Counties)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The selected vendor/contractor will provide labor, material, and equipment necessary to inspect, diagnose, repair, and verify functionality of the following boiler components: Deaerator tank level alarms and overflow testing Deaerator steam pressure/ temperature control and safety testing Condensate storage tank level alarms and overflow testing Economizer’s safety valve testing CO and combustible gas detection and alarm system testing Test plant and boiler emergency stop buttons and gas valves Adjust burner combustion settings and calibrate oxygen trim Check vibration of burner fans Calibrate instrumentation, monitoring, and control systems Calibrate pressure gages and thermometers High and low water alarm High-steam pressure cut-out (recycle) High-steam pressure cut-out (non-recycle) Steam safety valves lift test Steam safety valves (accumulation test at high fire) Flame scanner Check gas vent valve for leaks High-gas fuel pressure cut-off Low-gas fuel pressure cut-off-Gas fuel safety shut off valves proof of closure Leak test gas fuel safety shut off valves High-fuel oil temperature cut-off (heated fuel) Low-fuel oil temperature cut-off (heated fuel) Low-atomizing pressure for fuel oil High-fuel oil pressure cut-off Fuel oil safety shut off valves proof of closure Leak test fuel oil safety shut off valves Check operation of Liquid Petroleum Gas pilot Low-pilot gas pressure cut-out-Forced draft fan motor interlock Forced draft fan damper wide open for purge Boiler outlet damper wide open for purge Purge air flow interlock Timing for pre-purge Timing for post-purge Igniter timing Low fire position interlock Combustion air interlock Main flame out, i.e., time to close valves Ignition flame out, i.e., time to close valves Minimum igniter flame test Scanner not sensing ignition sparkLow-oxygen alarm and/or cut-out Pre-purge setting of flue gas recirculation damper Interlock of building outside air damper with burner controls Burner control Any other safety devices that require testing under VHA Directive 1810

Details

Division 01 - General Requirements, Allowances, Testing and Inspecting Allowances.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents