Similar Projects
Mission Bowl Apartments Redevelopment
New Construction
Pending Verification
$29,000,000 est. value
Mission, KS 66205

Brookridge Mixed Use Development
New Construction
Pending Verification
Overland Park, KS

Bonner Gateway Mixed Use Development
New Construction
Conception
Bonner Springs, KS

Legends 267 Apartments and Parking Garage
New Construction - 510,000 SF
Pending Verification
Kansas City, KS 66100

Reported 04/29/2021 11:09 PM
Project Title

5700 King Apartment Complex

Physical Address View project details and contacts
City, State (County) Shawnee Mission, KS   (Johnson County)
Category(s) Entertainment/Recreation, Residential
Sub-Category(s) Apartments/Condominiums, Swimming Pool(s)
Contracting Method Developer to Subcontract.
Project Status Site Analysis, Seeking Zoning Variances
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

open courtyard on the building's second level, swimming pool, greenhouse and 20,000-square-foot landscaped park with a fenced-in dog area

Details

Apartments/Condominiums, 5 Stories Above Grade, New Construction, 189 Unit(s), Swimming Pool(s).
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents