Similar Projects
Brantley Ellison Fitness / Biloxi
New Construction, Infrastructure
Conception
Biloxi, MS 39532

Collins Street Residences
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Biloxi, MS 39530

Blue Water Beach
Demolition, New Construction, Infrastructure
Design
$410,000,000 CJ est. value
Diberville, MS 39540

Flamingo Beach Inn & Comfort Inn/Choice Hotels Redevelopment
New Construction, Renovation, Infrastructure
Design
$15,000,000 CJ est. value
Biloxi, MS 39531

Storm Damage Repairs (EMER) South Mississippi Regional Center
Infrastructure
Bidding
$1,100,000 CJ est. value
Long Beach, MS 39560

Feb Rail Track Expansion Project
Infrastructure
Bidding
Gulfport, MS 39501

CTA Tram, Bike & Pedestrian Bridge
Infrastructure
Post-Bid
$200,000 CJ est. value
Gulfport, MS 39501

Rehabilitate Airfield Drainage Phase 2B FAA Airport Improvement Program Project
Infrastructure
Post-Bid
$1,500,000 CJ est. value
Gulfport, MS 39503

Hiller Park Boat Launch Improvements
Infrastructure
Results
$448,560 CJ est. value
Biloxi, MS 39531

Anniston Elementary Addition
Addition, Demolition, Renovation, Infrastructure
Results
$3,519,000 CJ est. value
Gulfport, MS 39507

Jiffy Lube / D'iberville
New Construction, Infrastructure - 3,438 SF
Construction
$1,500,000 CJ est. value
Diberville, MS 39540

Beach Vista Apartments
New Construction, Infrastructure
Construction
$10,000,000 CJ est. value
Biloxi, MS 39531

The Bella Condominiums
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Biloxi, MS 39530

Hillside Baptist Church / Harrison County
New Construction, Infrastructure - 4,320 SF
Pending Verification
$750,000 CJ est. value
Gulfport, MS 39503

Souvenir City Warehouse
New Construction, Infrastructure
Design
$500,000 CJ est. value
Biloxi, MS 39531

Last Updated 08/07/2023 04:42 PM
Project Title

Beach Boulevard Multi Residential Development / Biloxi

Physical Address View project details and contacts
City, State (County) Biloxi, MS 39531   (Harrison County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Multi-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $15,088,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the following: site work and new construction of a 38-unit multi-residential development. As of August 7, 2023, a general contractor has been selected for this project, and the project is under review by the city zoning commission, which met on July 26, 2023. A firm construction timeline for this project has not yet been released.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents