Similar Projects
200,000 Gallon Elevated Water Storage Tank Rehabilitation
Infrastructure, Alteration
Bidding
$200,000 est. value
Lexington, IL

Heartland Community College CTE Addition and Remodel
Renovation
Sub-Bidding
$300,000 est. value
Normal, IL 61761

Downtown Power Washing of Sidewalks
Post-Bid
Bloomington, IL

ISU Mennonite College of Nursing Simulation Lab
New Construction - 20,017 SF
Post-Bid
Normal, IL

Milner Library Faculty Success Center
Renovation
Results
Normal, IL

Watterson Dining and Servery Renovation
Renovation - 23,687 SF
Results
Normal, IL 61761

QBS DOIT Professional Fiber Engineering Services
Renovation, Infrastructure
Post-Bid

Cardinal Court Cypress Hall Flooring
Renovation - 36,428 SF
Results
Normal, IL 61761

2022-Equipment Purchase
Alteration
Post-Bid
IL

Cardinal Court Cypress Hall Paint
Results
Normal, IL 61761

Dualator Media Replacement
Renovation, Alteration
Post-Bid
Colfax, IL

2021 University Housing Maintenance Painting
Results
Normal, IL

ISU Athletic Practice Facility
New Construction - 79,000 SF
Post-Bid
Normal, IL 61761

Wilkins Residence Hall Paint
Results
Normal, IL

Job Order Contracting
Term Contract
Post-Bid

Last Updated 04/18/2022 03:40 PM
Project Title

ISU 2022 Maintenance Painting for Residence Halls and Apartments

Physical Address View project details and contacts
City, State (County) Normal, IL 61761   (McLean County)
Category(s) Education, Single Trades
Sub-Category(s) College/University, Painting, Service/Term Contracts
Contracting Method Competitive Bids.
Project Status Bidding, Construction Completion Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor or contractors to complete maintenance painting during the summer turnover process. This will occur in all residence halls and UHS-owned properties. Contractor will provide all labor, equipment, and materials (i.e. patching, materials, plaster, primer, finish paint, brushes, rollers, etc.) required to paint all student apartments, corridors, and stairways on all four floors noted in schedule. The scope of work is undefined at this moment, as we will not gain entry into student rooms to inspect for damages until they leave in May 2022. Nevertheless, it is critical that this work occur in a timely manner, in order to maintain a visually pleasing residential environment for our students. Contractor will submit a bid for the patching and painting as specified in these specifications in the following areas: student rooms (defined as any room with a mattress), kitchen, living rooms, and bathrooms.

Details

College/University, Renovation.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents