Similar Projects
Orange Lake Associates RV Resort Park
New Construction, Infrastructure
Conception
Citra, FL

Bayou Concrete - Four Points Way / Tallahassee
New Construction, Infrastructure
Conception
Tallahassee, FL 32305

Nolte Road Commercial Park Master Plan
New Construction
Design
Saint Cloud, FL 34772

Highpointe PUD
New Construction - 588,000 SF
Design
Stuart, FL 34997

Babcock Ranch WMA - Deep Freeze South
Infrastructure
Bidding
$380,000 est. value
Tallahassee, FL

Jackson Creek Flood Plain Expansion Construction Project
Infrastructure
Bidding
$50,000 est. value
Pensacola, FL

CVS # 4201 - Exterior ADA Improvements
Renovation
Post-Bid
$15,000 est. value
Fort Lauderdale, FL 33304

CVS # 7891 - ADA Exterior Improvements
Renovation
Post-Bid
$225,000 est. value
Lake Worth, FL 33467

Construction Management at Risk Services for the Cecil Airport Eastside Development Site
New Construction - 370,000 SF
Results
Jacksonville, FL 32221

Site Maintenance
Results
Newberry, FL 32669

Unifirst - Pompano Beach
New Construction, Addition - 9,056 SF
Construction
$1,200,000 est. value
Pompano Beach, FL 33069

Home Depot Site Work at Alton
New Construction
Construction
Palm Beach Gardens, FL 33418

Sumter Villas
New Construction
Pending Verification
Bushnell, FL

Windermere Ward Trail - Town of Windermere
Infrastructure
Conception
Less than $2,590,000 est. value
Windermere, FL

Deuces Rising Townhomes and Commercial Development
Design
$16,000,000 est. value
Saint Petersburg, FL

Last Updated 06/16/2022 12:27 AM
Project Title

Horizontal Directional Drilling for Access Control

Physical Address View project details and contacts
City, State (County) Sarasota, FL   (Sarasota County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall install approximately 6,410 linear feet of 2-inch HDPE conduit via combination of horizontal directional drilling and open trenching. The conduit shall be installed in bundles through single boreholes as shown on the Site Plan and on the Conduit Runs Table. The Contractor shall install the conduit at the length required without joints and terminate at the locations shown.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods, Tunnel Excavation, Tunnel Excavation by Drilling and Blasting.
Division 33 - Utilities, Common Work Results for Utilities, Trenchless Utility Installation, Utility Horizontal Directional Drilling.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents