Similar Projects
Brockett Road and Montreal Road Sidewalk Project
Infrastructure
Bidding
Tucker, GA

I-285 WB Ashford Dunwoody Road Ramp Extension
Post-Bid
GA

Dunwoody Parking Lot Repairs
Post-Bid
$380,000 est. value
Dunwoody, GA 30338

Peeler Road Sidewalks Project
Results
Dunwoody, GA 30338

Cowan Road and Lynburn Drive Sidewalk Project
Results
Less than $247,660 est. value
Tucker, GA 30084

Emmanuel Seventh Day Adventist Church Parking Lot Expansion
New Construction
Construction
Lithonia, GA 30058

Public Work Services
Post-Bid
Brookhaven, GA

East Mountain Street Sidewalk
Results
Stone Mountain, GA 30086

Winters Chapel Road Multi-Use Trail, Phase 1
Infrastructure
Post-Bid
Dunwoody, GA

Pedestrian Enhancements - Trailhead and Rowland Street
Results
Clarkston, GA

Parking Lot Repair/Resurface/Sealcoat
Infrastructure
Post-Bid
Chamblee, GA 30341

Elmdale Drive Sidewalk Project
Results
Tucker, GA 30084

0.180 Mile of Widening and Reconstruction for Ramp Improvements on US 78/SR 10 at SR 236
Results
GA

Ashford Dunwoody Road Multiuse Path
New Construction
Results
Brookhaven, GA

Pedestrian Safety And Bicycle Trail Improvements
Results
Decatur, GA

Last Updated 11/12/2021 09:32 AM
Project Title

Murphey Candler Park - Pool Parking Improvements

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30319   (DeKalb County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $629,380
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed Pool Parking Improvement project located at the swimming pool in Murphey Candler Park, on Candler Lake W NE, in Brookhaven, GA, includes, but is not limited to, the following: • Picking up LDP20-00020 from the City of Brookhaven. • Protection of existing trees and bushes on the site. • Install tree protection fencing according to new tree ordinance and plans. • Coordination and collaboration with the tree care company hired by the City. • Erosion control and protection of existing vegetation. • Clearing trees and shrubs in designated areas. • Milling surface of asphalt parking lot as identified. • Demolition of asphalt parking lot as identified to be removed. • Removal of asphalt and concrete curbs identified to be removed • Staking out curbs and parking improvements for review and adjustment. • Full depth patching of parts of the parking lot. • Resurface topping coats over old pavement. • New base and asphalt pavement. • Striping for parking spaces and crosswalks. • Placing new concrete curbs in the parking lot. • Placing sidewalk along Candler Lake West NE. • Installing guard rail and concrete border retaining wall along sidewalk • Coordination with City and Ga. Power to relocate power pole guy wires. • Storm drainage piping and structures as identified. • Landscape Planting and hose bib irrigation installation. • Bio-retention swales in the parking lot. • Gravel emergency and fire exit driveway with bollards. • Tree care and protection for the trees identified to remain.

Details

Division 03 - Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents