Similar Projects
Full Maintenance Services Contract San Antonio, Pearsall, and New Federal Courthouse
Design
Pearsall, San Antonio, TX 78205

Full Maintenance Services Contract San Antonio, Pearsall, and New Federal Courthouse
Design
Pearsall, San Antonio, TX 78205

Pest Control Services
Bidding
Brownsville, TX

Pest Control
Bidding
Tyler, TX

Pest Control Management Services
Term Contract
Post-Bid
Austin, TX 78759

Custodial Cleaning and Maintenance Services
Post-Bid
Corpus Christi, TX 78401

Water Extraction Services
Term Contract
Results
TX 78539

Water Sampling Stations
Results
$14,108 est. value
Irving, TX 75060

JOC - IDIQ Construction
Bidding
Houston, TX

Clean Out of Lift Stations/Cooling Tower Basins and Removal of Dewater Sludge
Post-Bid
College Station, TX 77845

Ultra High Pressure Water Blasting
Results
Less than $284,553 est. value
TX

Construction Equipment Services and Related Items
Bidding
TX

Pest Control Services at Bentsen-Rio Grande Valley State Park
Term Contract
Post-Bid
Mission, TX 78572

Rental of Portable Toilets and Hand-Washing Stations
Results
McAllen, TX 78501

FY20 Monthly and Other Pest Control Services
Term Contract
Post-Bid
Richmond, TX 77469

Reported 03/18/2021 12:00 AM
Project Title

Base Life Support for XCTC

Physical Address View project details and contacts
City, State (County) Fort Hood, TX   (Bell County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

requirements of the XCTC mission will be for the vendor to provide a turnkey solution to provide life support areas at North Fort Hood (TA-60) and South Fort Hood (TA-40) for up to 4,000 Soldiers: This turnkey operation will include the set up and tear down of Sleeping Tents, portable chemical latrines, stationary latrines and showers, hand washing stations, generator power, light sets, laundry facilities, garbage removal, gray and black water removal. Contractor must be able to read a 10 digit grid coordinate to be able to stage chemical latrines and light sets. Contractor must be able to provide a project manager for the COR and the contracting office to reach out to at anytime, and to provide 24 support if needed.

Details

Division 01 - General Requirements, Cleaning and Waste Management, Progress Cleaning, Site Maintenance, Construction Waste Management and Disposal, Final Cleaning.
Division 02 - Existing Conditions, Hazardous Material Assessment, Site Remediation, Contaminated Site Material Removal.
Division 13 - Special Construction, Fabricated Rooms, Storm Shelter Rooms, Fabricated Engineered Structures, Fabricated Structures, Portable and Mobile Buildings.
Division 26 - Electrical.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents