Similar Projects
Tidal Barriers and Levee Upgrades
Infrastructure
Conception
$15,000,000 est. value
Corte Madera, CA

Lower Las Gallinas Creek Dredge CSA 6 Santa Venetia - Marin County
Infrastructure
Conception
$2,200,000 CJ est. value
San Rafael, CA 94901

North Bay Children’s Center facilities
Demolition, New Construction, Infrastructure - 32,339 SF
Design
$9,200,000 CJ est. value
Novato, CA 94949

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Downtown Paving and Sidewalk Rehabilitation Project - Phase 3
Infrastructure
Bidding
$2,200,000 CJ est. value
Mill Valley, CA 94941

Mount Tamalpais State Park Water Well Drilling
Infrastructure
Bidding
$250,000 CJ est. value
Mill Valley, CA 94941

The Neighborhood at Los Gamos
New Construction, Infrastructure - 5,500 SF
Post-Bid
$69,000,000 CJ est. value
San Rafael, CA 94903

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

Paper Mill Creek Storm Drain Inlet Upgrades
Infrastructure
Results
$362,100 est. value
Novato, CA 94949

Barber Avenue Pipeline Replacement Project
Renovation, Infrastructure
Results
$163,800 CJ est. value
San Anselmo, CA 94960

Vivian Street Multi-Residential
New Construction, Infrastructure
Pending Verification
$26,000,000 CJ est. value
San Rafael, CA 94901

Aldersly Retirement Community Redevelopment
Demolition, New Construction, Renovation, Infrastructure
Pending Verification
$20,000,000 CJ est. value
San Rafael, CA 94901

Southern Heights Boulevard at Courtright Road Retaining Wall - 206.14 - City of San Rafael
Renovation, Infrastructure
Conception
$800,000 CJ est. value
San Rafael, CA 94901

Fort Baker Sewer and Manhole
Term Contract
Design
Mill Valley, CA 94941

RFQ/P Contractor - Lease-Leaseback Construction Services Sinaloa and San Jose Middle Schools Track and Field Project
Infrastructure
Bidding
$1,000,000 CJ est. value
Novato, CA 94945

Last Updated 11/07/2022 03:39 PM
Project Title

Corte Madera Creek Flood Management Project - Zone 9 - Marin County

Physical Address View project details and contacts
City, State (County) San Rafael, CA 94901   (Marin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storm/Sewers
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $9,750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project EIR was completed in 2021. The project description includes channel grading and replacing the fish ladder in the Town of Ross and downstream in Kentfield constructing a new pump station for the Granton Park neighborhood, adding an access ramp down into the concrete channel for equipment maintenance, and improving fish passage by constructing new fish resting pools in the bottom of the channel. The project is partially funded by a California Department of Water Resources grant. The remaining project costs are covered by the Flood Control Zone 9 fee and ad valorem revenues. Total construction cost estimate is $9,000,000 (planning level estimate). The County's American Rescue Act is funding a portion of the project at the downstream end of the concrete channel next to the College of Marin. This project is being managed by the Friends of Corte Madera Creek Watershed in partnership with Flood Zone 9, with funding from a State of CA Coastal Conservancy grant for design. This project was approved to be included with the existing DWR grant for construction, but unfortunately the existing FEMA model had an error misrepresenting the existing concrete channel width. This error is being corrected but will need review and certification from FEMA to proceed to ensure no rise of 0.00’. This means the project will be delayed into the 2023 construction season. Information on the project can be found on Friends Madera Creek’s website: https://friendsofcortemaderacreek.org/new_site Project is included in the Marin County's FY 2022-2027 CIP. As of November 7, 2022, information regarding a design team or a general contractor is not available. Construction is anticipated to begin in 2023.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents