Similar Projects
Water Station Electrical Improvements - Pump and Motor Replacement - All Stations
Infrastructure
Conception
$2,566,741 est. value
Schaumburg, IL

Water Well No. 9 Rehabilitation
Infrastructure
Bidding
$2,000,000 est. value
Elk Grove Village, IL

Furnish and Deliver Sump Pumps to Various Locations for a One-year Period
Term Contract
Bidding
$38,000 est. value
Chicago, IL

Alaris IV Pumps
Post-Bid
Chicago Heights, IL

Replace Pump 8 and Install New VFD for Pump 13 at the Touhy Avenue Pump Station
Infrastructure
Post-Bid
Niles, IL 60714

Mainstream Tarp Pumps Rehabilitation
Results
$19,484,000 to $23,585,000 est. value
Hodgkins, IL 60525

Water Treatment Plant High Service Pump Replacement
Results
Chicago, IL

Well Sealing Villa Santa Maria Convent
Infrastructure
Post-Bid
Less than $25,000 est. value
Oak Forest, IL 60452

CPS Burbank ES Chilled Water Pump Replacement
Renovation
Results
Chicago, IL 60639

Inspection, Preventative Maintenance, Repair, Replacement of VFD Pumps
Term Contract, Infrastructure
Post-Bid
Chicago, IL

CPS Walt Disney Magnet Ejector Pump Loading Dock Replacement
Results
Chicago, IL 60613

Pump Preventative Maintenance and As-Needed Repairs
Term Contract
Post-Bid
Glenview, IL

CPS Haines ES Booster Pump Replacement
Term Contract
Results
Chicago, IL 60616

Pentair Hydromatic Pumps
Infrastructure
Post-Bid
Chicago, IL

Water Supply Well No. 4 Abandonment
Infrastructure
Results
Mount Prospect, IL

Reported 05/24/2022 12:00 AM
Project Title

Municipal Water Well Abandonment

Physical Address View project details and contacts
City, State (County) Bartlett, IL 60103   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Village of Bartlett Municipal Water Well Abandonment Four (4) wells: Wells 1-2 at 300 S. Main St in Cook County, Well 5 at 818 Kent Circle in DuPage County, and Well 8 at 401 Schick Rd in DuPage County.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents